Difference between revisions of "Serrette Gas Field"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Operator: BP * Country: Trinidad And Tobago * Location: Block Samaan, off the east coast of Trinidad * Production start: 2011 * Partners: * Typ...")
 
Line 14: Line 14:
 
* Production from Serrette is tied into bpTT's [[Cassia Gas and Condensate Fields | Cassia B hub]] via a 26-inch diameter, 32-mile long pipeline
 
* Production from Serrette is tied into bpTT's [[Cassia Gas and Condensate Fields | Cassia B hub]] via a 26-inch diameter, 32-mile long pipeline
 
* Production from this facility supplies the domestic market and the [[Atlantic LNG Terminal]]
 
* Production from this facility supplies the domestic market and the [[Atlantic LNG Terminal]]
 +
* The Angelin development includes an unmanned platform and four wells and is tied back to the Serrette platform
  
 
=== Contractors ===
 
=== Contractors ===
* **Fluor Summit Engineering:** Design of Production facility
+
* '''Fluor Summit Engineering:''' Design of Production facility
* **Trinidad Offshore Fabricators (TOFCO):** Construction of installation
+
* '''Trinidad Offshore Fabricators (TOFCO):''' Construction of installation
* **Fugro:** Pipeline laying  
+
* '''Fugro:''' Pipeline laying  
  
 
=== History ===
 
=== History ===
 
* 2009 - Investment decision taken
 
* 2009 - Investment decision taken
 
* 2011 - First gas produced
 
* 2011 - First gas produced
 +
* 2019 - The Angelin platform starts production
  
 
=== Geology ===
 
=== Geology ===
Line 31: Line 33:
 
# [http://killajoules.wikidot.com/archive:fugro-awarded-bp-trinidad-tobago-contract Fugro Awarded BP Trinidad & Tobago Contract]
 
# [http://killajoules.wikidot.com/archive:fugro-awarded-bp-trinidad-tobago-contract Fugro Awarded BP Trinidad & Tobago Contract]
 
# [http://killajoules.wikidot.com/blog:1216 BPTT begins Gas Production from Serrette]
 
# [http://killajoules.wikidot.com/blog:1216 BPTT begins Gas Production from Serrette]
 +
# [https://abarrelfull.blogspot.com/2024/02/bp-starts-gas-production-from-trinidad.html BP starts gas production from Trinidad and Tobago’s Angelin project]
  
  

Revision as of 08:44, 21 February 2024

Summary Information

  • Operator: BP
  • Country: Trinidad And Tobago
  • Location: Block Samaan, off the east coast of Trinidad
  • Production start: 2011
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • Serrette is located in 280 feet (90 metres) of water off Trinidad's south east coast
  • Serrette is a normally unmanned installation (NUI)
  • Production from Serrette is tied into bpTT's Cassia B hub via a 26-inch diameter, 32-mile long pipeline
  • Production from this facility supplies the domestic market and the Atlantic LNG Terminal
  • The Angelin development includes an unmanned platform and four wells and is tied back to the Serrette platform

Contractors

  • Fluor Summit Engineering: Design of Production facility
  • Trinidad Offshore Fabricators (TOFCO): Construction of installation
  • Fugro: Pipeline laying

History

  • 2009 - Investment decision taken
  • 2011 - First gas produced
  • 2019 - The Angelin platform starts production

Geology

Links

  1. TOFCO Platform References
  2. Fugro Awarded BP Trinidad & Tobago Contract
  3. BPTT begins Gas Production from Serrette
  4. BP starts gas production from Trinidad and Tobago’s Angelin project