Difference between revisions of "Sepetiba FPSO"

From A Barrel Full
Jump to navigation Jump to search
Line 5: Line 5:
 
* Country: Brazil
 
* Country: Brazil
 
* Ownership: SBM Offshore
 
* Ownership: SBM Offshore
* Website:  
+
* Website: https://www.sbmoffshore.com/
 
* Field Operated By: Sepetiba FPSO
 
* Field Operated By: Sepetiba FPSO
 
* Capacity: 180,000 bpd  
 
* Capacity: 180,000 bpd  
Line 13: Line 13:
  
 
* The vessel has capacity to produce up to 180 thousand barrels of oil a day and compress up to 12 million cubic meters of gas.
 
* The vessel has capacity to produce up to 180 thousand barrels of oil a day and compress up to 12 million cubic meters of gas.
* It is the  
+
* It is the second phase of the Mero development
  
 
=== Contractors ===
 
=== Contractors ===
*  
+
* SBM Offshore: Construction, lease and operation
  
 
=== Status ===
 
=== Status ===
* -
+
* In operation
  
 
=== History ===
 
=== History ===
* 2020 - Phase 3 of the Mero development launched
+
* 2019 - Phase 2 of the Mero development launched
 
* 2023 - First oil produced
 
* 2023 - First oil produced
  
Line 31: Line 31:
 
=== Links ===
 
=== Links ===
  
# [https://abarrelfull.blogspot.com/2023/12/brazil-total-launches-phase-3-on-giant.html Brazil: Total Launches Phase 3 On the Giant Mero Field Development]
+
# [https://abarrelfull.blogspot.com/2024/01/sbm-offshore-signs-fpso-sepetiba.html Brazil: SBM Offshore signs FPSO Sepetiba contracts]
 
# [https://a-barrel-full.blogspot.com/2024/01/petrobras-puts-platform-vessel-into-pre.html Petrobras puts platform vessel into pre-salt production]
 
# [https://a-barrel-full.blogspot.com/2024/01/petrobras-puts-platform-vessel-into-pre.html Petrobras puts platform vessel into pre-salt production]
  

Revision as of 10:34, 2 January 2024

Summary Information

Brief Description

  • The vessel has capacity to produce up to 180 thousand barrels of oil a day and compress up to 12 million cubic meters of gas.
  • It is the second phase of the Mero development

Contractors

  • SBM Offshore: Construction, lease and operation

Status

  • In operation

History

  • 2019 - Phase 2 of the Mero development launched
  • 2023 - First oil produced

Other Information

  • -

Links

  1. Brazil: SBM Offshore signs FPSO Sepetiba contracts
  2. Petrobras puts platform vessel into pre-salt production