Difference between revisions of "Sepetiba FPSO"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Name: * Field: * Country: * Ownership: * Website: * Field Operated By: * Capacity: bpd * Year of Completion: === Brief Description ===...")
 
Line 1: Line 1:
 
=== Summary Information ===
 
=== Summary Information ===
  
* Name:  
+
* Name: Sepetiba FPSO
* Field:  
+
* Field: [[Mero Oil Field]]
* Country:  
+
* Country: Brazil
* Ownership:  
+
* Ownership: SBM Offshore
 
* Website:  
 
* Website:  
* Field Operated By:
+
* Field Operated By: Sepetiba FPSO
* Capacity: bpd  
+
* Capacity: 180,000 bpd  
* Year of Completion:  
+
* Year of Completion: 2023
  
 
=== Brief Description ===
 
=== Brief Description ===
  
* -
+
* The vessel has capacity to produce up to 180 thousand barrels of oil a day and compress up to 12 million cubic meters of gas.
 +
* It is the
  
 
=== Contractors ===
 
=== Contractors ===
Line 21: Line 22:
  
 
=== History ===
 
=== History ===
* -
+
* 2020 - Phase 3 of the Mero development launched
 +
* 2023 - First oil produced
  
 
=== Other Information ===
 
=== Other Information ===
Line 29: Line 31:
 
=== Links ===
 
=== Links ===
  
# [ ]
+
# [https://abarrelfull.blogspot.com/2023/12/brazil-total-launches-phase-3-on-giant.html Brazil: Total Launches Phase 3 On the Giant Mero Field Development]
 +
# [https://a-barrel-full.blogspot.com/2024/01/petrobras-puts-platform-vessel-into-pre.html Petrobras puts platform vessel into pre-salt production]
  
 
[[Category:FSPO]]
 
[[Category:FSPO]]
[[Category:Country]]
+
[[Category:Brazil]]
[[Category:Company]]
+
[[Category:Petrobras]]

Revision as of 10:28, 2 January 2024

Summary Information

  • Name: Sepetiba FPSO
  • Field: Mero Oil Field
  • Country: Brazil
  • Ownership: SBM Offshore
  • Website:
  • Field Operated By: Sepetiba FPSO
  • Capacity: 180,000 bpd
  • Year of Completion: 2023

Brief Description

  • The vessel has capacity to produce up to 180 thousand barrels of oil a day and compress up to 12 million cubic meters of gas.
  • It is the

Contractors

Status

  • -

History

  • 2020 - Phase 3 of the Mero development launched
  • 2023 - First oil produced

Other Information

  • -

Links

  1. Brazil: Total Launches Phase 3 On the Giant Mero Field Development
  2. Petrobras puts platform vessel into pre-salt production