Sebei-Xining-Lanzhou Gas Pipeline

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Source: Sebei in Qinghai Province, China
  • Destination: Xining and Lanzhou, China
  • Ownership: Petrochina
  • Website: http://www.petrochina.com.cn/
  • Length: 930 kilometres ( miles)
  • Capacity: 2 billion cubic meters per annum
  • Status: Operating

+++ Details

  • The Sebei-Xining-Lanzhou Gas Pipeline transmits natural gas from gas-rich Sebei in Qinghai Province, to the Xining and Lanzhou areas. With a total length of 930 kilometers, the pipeline starts from [[[Sebei Gas Field | Sebei No.1 Gas Field]]] in Qaidam Basin, Qinghai, runs through Xining and terminates in Lanzhou, Gansu. The 660 mm-diameter pipeline has a designed pressure of 6.4Mpa and a designed annual capacity of 2 billion cubic meters. Total investment in the pipeline amounted to RMB2.25 billion.

+++ History

  • 2000 - Construction started
  • 2001 - the Sebei-Xining section successfully started to transport gas
  • 2001 - The project was completed

+++ Other Information

  • -

+++ Links