Difference between revisions of "Seagull Oil Field"

From A Barrel Full
Jump to navigation Jump to search
 
Line 7: Line 7:
 
* Type: Oil / Gas
 
* Type: Oil / Gas
 
* Estimated Reserves:  
 
* Estimated Reserves:  
* Production Volume:  
+
* Production Volume: The fiedl should produce 50,000 bpd at its peak
  
 
=== Description ===
 
=== Description ===
Line 18: Line 18:
 
=== History ===
 
=== History ===
 
* 2019 - Seagull development approval received  
 
* 2019 - Seagull development approval received  
 +
* 2023 - First oil produced
  
 
=== Geology ===
 
=== Geology ===
Line 25: Line 26:
 
# [[UK Oil and Gas Fields by Approval Date]]
 
# [[UK Oil and Gas Fields by Approval Date]]
 
# [https://a-barrel-full.blogspot.com/2020/08/technipfmc-awarded-significant_29.html TechnipFMC Awarded a Significant Integrated EPCI (iEPCI™) Contract for Neptune Energy in the North Sea]
 
# [https://a-barrel-full.blogspot.com/2020/08/technipfmc-awarded-significant_29.html TechnipFMC Awarded a Significant Integrated EPCI (iEPCI™) Contract for Neptune Energy in the North Sea]
 +
# [https://a-barrel-full.blogspot.com/2023/11/production-begins-from-bp-operated.html Production begins from bp-operated Seagull field in North Sea]
  
  
 
[[category:Field]]
 
[[category:Field]]
 
[[category:UK]]
 
[[category:UK]]
 +
[[category:BP]]
 
[[category:Neptune]]
 
[[category:Neptune]]

Latest revision as of 14:34, 26 November 2023

Summary Information

  • Operator: Neptune
  • Country: United Kingdom
  • Location: Central North Sea
  • Production start:
  • Partners: Neptune 35%, BP 50%, Japex 15%
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume: The fiedl should produce 50,000 bpd at its peak

Description

  • Seagull is a high-pressure, high-temperature oil field located in the Central North Sea in a water depth of approximately 90 meters.
  • Comprising four subsea production wells, a new 5 kilometer pipe-in-pipe production line and a 17 kilometer control umbilical, Seagull outputs will travel via the Heron pipeline system to the BP-operated Eastern Trough Area Project Oil Fields, ETAP development and on through the Forties Pipeline System to Grangemouth, UK.

Contractors

  • TechnipFMC: Manufacture, deliver and installation of subsea equipment including production and water wash pipelines, umbilicals, subsea structures and control systems.

History

  • 2019 - Seagull development approval received
  • 2023 - First oil produced

Geology

Links

  1. UK Oil and Gas Fields by Approval Date
  2. TechnipFMC Awarded a Significant Integrated EPCI (iEPCI™) Contract for Neptune Energy in the North Sea
  3. Production begins from bp-operated Seagull field in North Sea