Difference between revisions of "Scarborough Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) (→Links) |
||
Line 27: | Line 27: | ||
=== Links === | === Links === | ||
# [https://lng-news.blogspot.com/2021/12/scarborough-and-pluto-train-2.html Scarborough And Pluto Train 2 Developments Approved] | # [https://lng-news.blogspot.com/2021/12/scarborough-and-pluto-train-2.html Scarborough And Pluto Train 2 Developments Approved] | ||
+ | # [https://a-barrel-full.blogspot.com/2021/12/subsea-7-awarded-contract-offshore_20.html https://a-barrel-full.blogspot.com/2021/12/subsea-7-awarded-contract-offshore_20.html] | ||
[[category:LNG]] | [[category:LNG]] | ||
[[category:Australia]] | [[category:Australia]] | ||
[[category:Woodside]] | [[category:Woodside]] |
Revision as of 10:49, 20 December 2021
Summary Information
- Operator: Woodside
- Country: Australia
- Location: Carnarvon Basin
- Production start:
- Partners:
- Type: Gas
- Estimated Reserves: 13 TCF
- Production Volume:
Description
- The Scarborough gas resource is located in the Carnarvon Basin, approximately 375 km west-north-west of the Burrup Peninsula in Western Australia.
- The Scarborough gas resource is part of the Greater Scarborough gas fields which are estimated to hold 13.0 Tcf (2C, 100%) of dry gas.
- The Greater Scarborough gas fields include Thebe (1.4 Tcf, 2C, 100%), Jupiter (0.5 Tcf, 2C, 100%) and Scarborough (11.1 Tcf, 2C, 100%).
- The proposal is to initially develop the field with eight subsea, high-rate gas wells, and thirteen wells drilled over the life of the Scarborough field, with all wells tied back to a semi-submersible floating production unit (FPU) moored in 950 m of water close to the Scarborough field.
- Approximately five million tonnes per annum (Mtpa) of Scarborough gas will be processed through Pluto Train 2, with up to 3 Mtpa processed through the existing Pluto Train 1.
Contractors
- -
History
- 2021 - FID for the project