Saxon Oil Field
Revision as of 16:17, 3 September 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Dana * Country: UK * Location: Central North Sea * Production start: 2007 * Partners: * Type: Oil * Estimated Reserves: * Production Volume:...")
Summary Information
- Operator: Dana
- Country: UK
- Location: Central North Sea
- Production start: 2007
- Partners:
- Type: Oil
- Estimated Reserves:
- Production Volume:
+++ Description
- The Saxon Field is located approximately 160km east of Aberdeen in Block 21/23b in the Central North Sea.
- Petro-Canada developed the Saxon field as a subsea tie-back to the existing Pict Oil Field manifold.
- The development consists of two production wells situated around a new drill centre (DC8) tied back to DC7 by a 2.35km 10" flexible production pipeline.
- Gas lift will be required from the start of production and this will be supplied from the existing Pict DC7 manifold through a new 4" flexible gas lift pipeline. A combined control, power, signal, hydraulic and chemical injection umbilical will also be installed from the DC7 manifold.
- Production is via the Triton FPSO
+++ Contractors
- **Penspen:** Saxon Development Detailed Design
- **Bibby Offshore:** Well tie ins
+++ History
- 2007 - Project development approved by UK Government
- 2007 - First oil production
- 2010 - Dana acquires the field from Petro-Canada