Saxi-Batuque Oil Field
Jump to navigation
Jump to search
Summary Information
- Operator: Exxon
- Country: Angola
- Location: Block 15
- Production start: 2008
- Partners: Exxon - 40%, BP - 26.67%, Eni - 20%, Statoil - 13.33%
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The field is part of the Kizomba C Project, along with the Mondo Oil Field
- The Saxi-Batuque project will be developed using a the Saxi-Batuque FPSO host with tie back of two drill centres for Batuque and two drill centres for Saxi.
+++ Contractors
- **Keppel:** FPSO conversion
- **Subsea 7:** Design, pipe fabrication and installation of 16 steel flowlines and their accompanying flowline terminations. In total, there will be 50km of flowlines ranging between 6” and 10” in diameter.
+++ History
- 2000 - Saxi oil field discovered
- 2006 - Subsea 7 awarded flowlines contract
- 2008 - FPSO conversion completed
+++ Geology
+++ Links