Savonette Gas Field
Revision as of 07:10, 21 November 2022 by Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Operator: BP * Country: Trinidad And Tobago * Location: Columbus basin * Production start: 2009 * Partners: * Type: Oil / Gas * Estimated Reser...")
Summary Information
- Operator: BP
- Country: Trinidad And Tobago
- Location: Columbus basin
- Production start: 2009
- Partners:
- Type: Oil / Gas
- Estimated Reserves: 2tcf
- Production Volume:
Description
- The platform is a normally unmanned installations operated remotely and only requires occasional day visits for maintenance
- Production ties into bpTT’s Mahogany B platform via a subsea pipeline, where it is processed and transported through existing pipelines to shore and then on for further processing at facilities on the western side of the island of Trinidad
Contractors
- **TOFCO:** Construction of platform Deck and Jacket & Subsea Spool Fabrication
- **Bibby Offshore:** Offshore construction
History
- 2004 - The Savonette field was discovered
- 2009 - First gas production
- 2012 - Reserves were revised to 2 tcf after Savonette 4 was drilled