(Created page with "Summary Information * Operator: ADMA-OPCO * Country: UAE * Location: 120 kilometres to the northwest of Abu Dhabi * Production start: 2016 - Expected * Partners: * Type: Oil...")
 
Line 16: Line 16:
 
* **Fluor:** Design of offshore wellhead facilities, subsea and in-field pipelines, the onshore scope including receiving, processing, storage and support facilities, and the supporting utilities and infrastructure.
 
* **Fluor:** Design of offshore wellhead facilities, subsea and in-field pipelines, the onshore scope including receiving, processing, storage and support facilities, and the supporting utilities and infrastructure.
 
* **Petrofac:**  
 
* **Petrofac:**  
* 200km of subsea pipelines for well fluid, water injection, gas injection, flare and export, along with 3km of onshore pipeline and 55km of subsea power and communication cables.  
+
** 200km of subsea pipelines for well fluid, water injection, gas injection, flare and export, along with 3km of onshore pipeline and 55km of subsea power and communication cables.  
* The provision of two riser platforms and four flare platforms with four interconnecting bridges and one single point mooring (SPM) buoy located at the north of Zirku Island.  
+
** The provision of two riser platforms and four flare platforms with four interconnecting bridges and one single point mooring (SPM) buoy located at the north of Zirku Island.  
* The onshore scope of the contract includes the following: drilling utilities, foundations on SARB1 and SARB2, transport, install, hook up and assistance in the commissioning of the accommodation modules.
+
** The onshore scope of the contract includes the following: drilling utilities, foundations on SARB1 and SARB2, transport, install, hook up and assistance in the commissioning of the accommodation modules.
 
* **JDR:** design and manufacture of five subsea power and communication (composite) cables and associated accessories
 
* **JDR:** design and manufacture of five subsea power and communication (composite) cables and associated accessories
  
Line 24: Line 24:
 
* 2010 - Fluor Wins FEED Contract for full field development
 
* 2010 - Fluor Wins FEED Contract for full field development
 
* 2013 - Petrofac awarded major subsea project
 
* 2013 - Petrofac awarded major subsea project
 +
* 2021 - Cepsa sold its stake to TotalEnergies
  
 
+++ Geology
 
+++ Geology
Line 33: Line 34:
 
# [http://killajoules.wikidot.com/archive:petrofac-awarded-us-500-million-offshore-project-in Petrofac Awarded US$500 Million Offshore Project in Abu Dhabi]
 
# [http://killajoules.wikidot.com/archive:petrofac-awarded-us-500-million-offshore-project-in Petrofac Awarded US$500 Million Offshore Project in Abu Dhabi]
 
# [http://killajoules.wikidot.com/archive:petrofac-awards-jdr-contract-for-subsea-power-cables Petrofac Awards JDR Contract For Subsea Power Cables At Abu Dhabi’s Satah Al-Razboot (Sarb) Offshore Oil Field Development]
 
# [http://killajoules.wikidot.com/archive:petrofac-awards-jdr-contract-for-subsea-power-cables Petrofac Awards JDR Contract For Subsea Power Cables At Abu Dhabi’s Satah Al-Razboot (Sarb) Offshore Oil Field Development]
 +
# [https://abarrelfull.blogspot.com/2023/10/cepsa-accelerates-its-positive-motion.html Cepsa accelerates its Positive Motion strategy implementation with the sale of its upstream assets in Abu Dhabi to TotalEnergies]

Revision as of 13:14, 14 October 2023

Summary Information

  • Operator: ADMA-OPCO
  • Country: UAE
  • Location: 120 kilometres to the northwest of Abu Dhabi
  • Production start: 2016 - Expected
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • The Satah Al-Razboot (SARB) Full Field Development Project includes an untapped oil field that will prospectively pump 100,000 barrels per day
  • Drilling will be conducted from two artificial islands (SARB1 and SARB2) with the well fluid sent by subsea pipeline to a facility on Zirku Island for processing, storage and export.

+++ Contractors

  • **Fluor:** Design of offshore wellhead facilities, subsea and in-field pipelines, the onshore scope including receiving, processing, storage and support facilities, and the supporting utilities and infrastructure.
  • **Petrofac:**
    • 200km of subsea pipelines for well fluid, water injection, gas injection, flare and export, along with 3km of onshore pipeline and 55km of subsea power and communication cables.
    • The provision of two riser platforms and four flare platforms with four interconnecting bridges and one single point mooring (SPM) buoy located at the north of Zirku Island.
    • The onshore scope of the contract includes the following: drilling utilities, foundations on SARB1 and SARB2, transport, install, hook up and assistance in the commissioning of the accommodation modules.
  • **JDR:** design and manufacture of five subsea power and communication (composite) cables and associated accessories

+++ History

  • 2010 - Fluor Wins FEED Contract for full field development
  • 2013 - Petrofac awarded major subsea project
  • 2021 - Cepsa sold its stake to TotalEnergies

+++ Geology

+++ Links

  1. Bluewater Calm Buoy Mooring References
  2. Fluor Wins Offshore FEED Contract in Abu Dhabi
  3. Petrofac Awarded US$500 Million Offshore Project in Abu Dhabi
  4. Petrofac Awards JDR Contract For Subsea Power Cables At Abu Dhabi’s Satah Al-Razboot (Sarb) Offshore Oil Field Development
  5. Cepsa accelerates its Positive Motion strategy implementation with the sale of its upstream assets in Abu Dhabi to TotalEnergies