Difference between revisions of "Satah Al-Razboot SARB Oil Field"

From A Barrel Full
Jump to navigation Jump to search
Line 24: Line 24:
 
* 2010 - Fluor Wins FEED Contract for full field development
 
* 2010 - Fluor Wins FEED Contract for full field development
 
* 2013 - Petrofac awarded major subsea project
 
* 2013 - Petrofac awarded major subsea project
 +
* 2018 - First oil produced
 
* 2021 - Cepsa sold its stake to TotalEnergies
 
* 2021 - Cepsa sold its stake to TotalEnergies
 
* 2021 - ADNOC awarded drilling contracts to expand production
 
* 2021 - ADNOC awarded drilling contracts to expand production
Line 35: Line 36:
 
# [http://killajoules.wikidot.com/archive:petrofac-awarded-us-500-million-offshore-project-in Petrofac Awarded US$500 Million Offshore Project in Abu Dhabi]
 
# [http://killajoules.wikidot.com/archive:petrofac-awarded-us-500-million-offshore-project-in Petrofac Awarded US$500 Million Offshore Project in Abu Dhabi]
 
# [http://killajoules.wikidot.com/archive:petrofac-awards-jdr-contract-for-subsea-power-cables Petrofac Awards JDR Contract For Subsea Power Cables At Abu Dhabi’s Satah Al-Razboot (Sarb) Offshore Oil Field Development]
 
# [http://killajoules.wikidot.com/archive:petrofac-awards-jdr-contract-for-subsea-power-cables Petrofac Awards JDR Contract For Subsea Power Cables At Abu Dhabi’s Satah Al-Razboot (Sarb) Offshore Oil Field Development]
 +
# [https://abarrelfull.blogspot.com/2024/03/omv-started-production-in-abu-dhabi.html OMV started production in Abu Dhabi]
 
# [https://abarrelfull.blogspot.com/2023/10/cepsa-accelerates-its-positive-motion.html Cepsa accelerates its Positive Motion strategy implementation with the sale of its upstream assets in Abu Dhabi to TotalEnergies]
 
# [https://abarrelfull.blogspot.com/2023/10/cepsa-accelerates-its-positive-motion.html Cepsa accelerates its Positive Motion strategy implementation with the sale of its upstream assets in Abu Dhabi to TotalEnergies]
 
# [https://abarrelfull.blogspot.com/2024/03/adnoc-invests-over-750-million-in.html ADNOC Invests Over $750 Million in Drilling-related Services to Support Production Capacity Growth]
 
# [https://abarrelfull.blogspot.com/2024/03/adnoc-invests-over-750-million-in.html ADNOC Invests Over $750 Million in Drilling-related Services to Support Production Capacity Growth]

Revision as of 13:54, 26 March 2024

Summary Information

  • Operator: ADMA-OPCO
  • Country: UAE
  • Location: 120 kilometres to the northwest of Abu Dhabi
  • Production start: 2016 - Expected
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The Satah Al-Razboot (SARB) Full Field Development Project includes an untapped oil field that will prospectively pump 100,000 barrels per day
  • Drilling is conducted from two artificial islands (Al Qatia and Bu Sikeen) with the well fluid sent by subsea pipeline to a facility on Zirku Island for processing, storage and export.

Contractors

  • Fluor: Design of offshore wellhead facilities, subsea and in-field pipelines, the onshore scope including receiving, processing, storage and support facilities, and the supporting utilities and infrastructure.
  • Petrofac:
    • 200km of subsea pipelines for well fluid, water injection, gas injection, flare and export, along with 3km of onshore pipeline and 55km of subsea power and communication cables.
    • The provision of two riser platforms and four flare platforms with four interconnecting bridges and one single point mooring (SPM) buoy located at the north of Zirku Island.
    • The onshore scope of the contract includes the following: drilling utilities, foundations on SARB1 and SARB2, transport, install, hook up and assistance in the commissioning of the accommodation modules.
  • JDR: design and manufacture of five subsea power and communication (composite) cables and associated accessories

History

  • 2010 - Fluor Wins FEED Contract for full field development
  • 2013 - Petrofac awarded major subsea project
  • 2018 - First oil produced
  • 2021 - Cepsa sold its stake to TotalEnergies
  • 2021 - ADNOC awarded drilling contracts to expand production

Geology

Links

  1. Bluewater Calm Buoy Mooring References
  2. Fluor Wins Offshore FEED Contract in Abu Dhabi
  3. Petrofac Awarded US$500 Million Offshore Project in Abu Dhabi
  4. Petrofac Awards JDR Contract For Subsea Power Cables At Abu Dhabi’s Satah Al-Razboot (Sarb) Offshore Oil Field Development
  5. OMV started production in Abu Dhabi
  6. Cepsa accelerates its Positive Motion strategy implementation with the sale of its upstream assets in Abu Dhabi to TotalEnergies
  7. ADNOC Invests Over $750 Million in Drilling-related Services to Support Production Capacity Growth