Summary Information
+
=== Summary Information ===
 
* Operator: ADMA-OPCO
 
* Operator: ADMA-OPCO
 
* Country: UAE
 
* Country: UAE
Line 9: Line 9:
 
* Production Volume:  
 
* Production Volume:  
  
+++ Description
+
=== Description ===
 
*  The Satah Al-Razboot (SARB) Full Field Development Project includes an untapped oil field that will prospectively pump 100,000 barrels per day
 
*  The Satah Al-Razboot (SARB) Full Field Development Project includes an untapped oil field that will prospectively pump 100,000 barrels per day
* Drilling will be conducted from two artificial islands (SARB1 and SARB2) with the well fluid sent by subsea pipeline to a facility on Zirku Island for processing, storage and export.
+
* Drilling is conducted from two artificial islands (Al Qatia and Bu Sikeen) with the well fluid sent by subsea pipeline to a facility on Zirku Island for processing, storage and export.
  
+++ Contractors
+
=== Contractors ===
* **Fluor:** Design of offshore wellhead facilities, subsea and in-field pipelines, the onshore scope including receiving, processing, storage and support facilities, and the supporting utilities and infrastructure.
+
* '''Fluor:''' Design of offshore wellhead facilities, subsea and in-field pipelines, the onshore scope including receiving, processing, storage and support facilities, and the supporting utilities and infrastructure.
* **Petrofac:**
+
* '''Petrofac:'''
 
** 200km of subsea pipelines for well fluid, water injection, gas injection, flare and export, along with 3km of onshore pipeline and 55km of subsea power and communication cables.  
 
** 200km of subsea pipelines for well fluid, water injection, gas injection, flare and export, along with 3km of onshore pipeline and 55km of subsea power and communication cables.  
 
** The provision of two riser platforms and four flare platforms with four interconnecting bridges and one single point mooring (SPM) buoy located at the north of Zirku Island.  
 
** The provision of two riser platforms and four flare platforms with four interconnecting bridges and one single point mooring (SPM) buoy located at the north of Zirku Island.  
 
** The onshore scope of the contract includes the following: drilling utilities, foundations on SARB1 and SARB2, transport, install, hook up and assistance in the commissioning of the accommodation modules.
 
** The onshore scope of the contract includes the following: drilling utilities, foundations on SARB1 and SARB2, transport, install, hook up and assistance in the commissioning of the accommodation modules.
* **JDR:** design and manufacture of five subsea power and communication (composite) cables and associated accessories
+
* '''JDR:''' design and manufacture of five subsea power and communication (composite) cables and associated accessories
  
+++ History
+
=== History ===
 
* 2010 - Fluor Wins FEED Contract for full field development
 
* 2010 - Fluor Wins FEED Contract for full field development
 
* 2013 - Petrofac awarded major subsea project
 
* 2013 - Petrofac awarded major subsea project
 
* 2021 - Cepsa sold its stake to TotalEnergies
 
* 2021 - Cepsa sold its stake to TotalEnergies
  
+++ Geology
+
=== Geology ===
 
*  
 
*  
  
+++ Links
+
=== Links ===
 
# [[Bluewater Calm Buoy Mooring References]]
 
# [[Bluewater Calm Buoy Mooring References]]
 
# [http://killajoules.wikidot.com/archive:fluor-wins-offshore-feed-contract-in-abu-dhabi Fluor Wins Offshore FEED Contract in Abu Dhabi]
 
# [http://killajoules.wikidot.com/archive:fluor-wins-offshore-feed-contract-in-abu-dhabi Fluor Wins Offshore FEED Contract in Abu Dhabi]

Revision as of 13:26, 26 March 2024

Summary Information

  • Operator: ADMA-OPCO
  • Country: UAE
  • Location: 120 kilometres to the northwest of Abu Dhabi
  • Production start: 2016 - Expected
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The Satah Al-Razboot (SARB) Full Field Development Project includes an untapped oil field that will prospectively pump 100,000 barrels per day
  • Drilling is conducted from two artificial islands (Al Qatia and Bu Sikeen) with the well fluid sent by subsea pipeline to a facility on Zirku Island for processing, storage and export.

Contractors

  • Fluor: Design of offshore wellhead facilities, subsea and in-field pipelines, the onshore scope including receiving, processing, storage and support facilities, and the supporting utilities and infrastructure.
  • Petrofac:
    • 200km of subsea pipelines for well fluid, water injection, gas injection, flare and export, along with 3km of onshore pipeline and 55km of subsea power and communication cables.
    • The provision of two riser platforms and four flare platforms with four interconnecting bridges and one single point mooring (SPM) buoy located at the north of Zirku Island.
    • The onshore scope of the contract includes the following: drilling utilities, foundations on SARB1 and SARB2, transport, install, hook up and assistance in the commissioning of the accommodation modules.
  • JDR: design and manufacture of five subsea power and communication (composite) cables and associated accessories

History

  • 2010 - Fluor Wins FEED Contract for full field development
  • 2013 - Petrofac awarded major subsea project
  • 2021 - Cepsa sold its stake to TotalEnergies

Geology

Links

  1. Bluewater Calm Buoy Mooring References
  2. Fluor Wins Offshore FEED Contract in Abu Dhabi
  3. Petrofac Awarded US$500 Million Offshore Project in Abu Dhabi
  4. Petrofac Awards JDR Contract For Subsea Power Cables At Abu Dhabi’s Satah Al-Razboot (Sarb) Offshore Oil Field Development
  5. Cepsa accelerates its Positive Motion strategy implementation with the sale of its upstream assets in Abu Dhabi to TotalEnergies