Difference between revisions of "Sarroch Refinery Upgrade Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) (→Links) |
||
Line 32: | Line 32: | ||
=== Links === | === Links === | ||
# [http://killajoules.wikidot.com/archive:foster-wheeler-awarded-contract-by-saras-for-refiner Foster Wheeler Awarded Contract by Saras for Refinery Revamp in Italy] | # [http://killajoules.wikidot.com/archive:foster-wheeler-awarded-contract-by-saras-for-refiner Foster Wheeler Awarded Contract by Saras for Refinery Revamp in Italy] | ||
− | # [https://www.saras.it/sites/default/files/documents_attachments/SARAS_Fourth_Quarter_2013_Results_-_FINAL_-_20Feb2014.pdf 2013 full year results | + | # [https://www.saras.it/sites/default/files/documents_attachments/SARAS_Fourth_Quarter_2013_Results_-_FINAL_-_20Feb2014.pdf 2013 full year results presentation] |
+ | |||
+ | [[category:Refinery]] | ||
+ | [[category:Italy]] |
Latest revision as of 08:40, 17 March 2020
Contents
Summary Information
- Ownership: Saras SPA
- Website: http://www.saras.it/
- Wiki Page: Sarroch Refinery
- Location: The Southwestern coast of Sardinia
- Capacity: million tons/annum & bbl/day
- Nelson Complexity:
- Project Stage: Completed 2013
- Budget:
The Project
- Project Type: Revamp of the Hydrocracker
- Project Summary: The revamp's objectives are the upgrade of the mild hydrocracker's capacity, performance and conversion, while achieving a longer catalyst life duration. The revamp includes major modification to the reaction section, including installation of a new pretreat reactor, as well as upgrading the gas compression circuit and installing a new high-pressure amine wash section.
- Main Contractors
- Foster Wheeler: engineering, procurement, and construction management
Refining Units
Hydrocracker Revamp
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
-
Products Produced
- The project increased diesel production by ~600 ktons/year and refinery runs by ~650 ktons/year
History
- 2008 - Foster Wheeler awarded an engineering, procurement, and construction management contract
- 2013 - The project was completed
Other Information
-