(Created page with "=== Summary Information === * Ownership: Saras SPA * Website: http://www.saras.it/ * Wiki Page: Sarroch Refinery * Location: The Southwestern coast of Sardinia * Capacity:...")
 
Line 8: Line 8:
 
* Project Stage: Completed 2013
 
* Project Stage: Completed 2013
 
* Budget:
 
* Budget:
The Project ===
+
=== The Project ===
 
* Project Type: Revamp of the Hydrocracker
 
* Project Type: Revamp of the Hydrocracker
 
* Project Summary: The revamp's objectives are the upgrade of the mild hydrocracker's capacity, performance and conversion, while achieving a longer catalyst life duration. The revamp includes major modification to the reaction section, including installation of a new pretreat reactor, as well as upgrading the gas compression circuit and installing a new high-pressure amine wash section.
 
* Project Summary: The revamp's objectives are the upgrade of the mild hydrocracker's capacity, performance and conversion, while achieving a longer catalyst life duration. The revamp includes major modification to the reaction section, including installation of a new pretreat reactor, as well as upgrading the gas compression circuit and installing a new high-pressure amine wash section.
 
* Main Contractors
 
* Main Contractors
 
** Foster Wheeler: engineering, procurement, and construction management
 
** Foster Wheeler: engineering, procurement, and construction management
 +
 
=== Refining Units ===
 
=== Refining Units ===
 
Hydrocracker Revamp
 
Hydrocracker Revamp

Revision as of 08:39, 17 March 2020

Summary Information

  • Ownership: Saras SPA
  • Website: http://www.saras.it/
  • Wiki Page: Sarroch Refinery
  • Location: The Southwestern coast of Sardinia
  • Capacity: million tons/annum & bbl/day
  • Nelson Complexity:
  • Project Stage: Completed 2013
  • Budget:

The Project

  • Project Type: Revamp of the Hydrocracker
  • Project Summary: The revamp's objectives are the upgrade of the mild hydrocracker's capacity, performance and conversion, while achieving a longer catalyst life duration. The revamp includes major modification to the reaction section, including installation of a new pretreat reactor, as well as upgrading the gas compression circuit and installing a new high-pressure amine wash section.
  • Main Contractors
    • Foster Wheeler: engineering, procurement, and construction management

Refining Units

Hydrocracker Revamp

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

-

Products Produced

  • The project increased diesel production by ~600 ktons/year and refinery runs by ~650 ktons/year

History

  • 2008 - Foster Wheeler awarded an engineering, procurement, and construction management contract
  • 2013 - The project was completed

=== Other Information

-

Links

  1. Foster Wheeler Awarded Contract by Saras for Refinery Revamp in Italy
  2. 2013 full year results rpesentation