Difference between revisions of "Sapphire Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: BG Group * Country: Egypt * Location: 74 km from the Nile Delta shoreline * Production start: 2005 * Partners: * Type: Gas * Estimated Reserves...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Operator: BG Group | * Operator: BG Group | ||
* Country: Egypt | * Country: Egypt | ||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* The Sapphire field is located 74 km from the Nile Delta shoreline, south west of the Simian field | * The Sapphire field is located 74 km from the Nile Delta shoreline, south west of the Simian field | ||
* Consist of long distance subsea tiebacks between 8 subsea production wells located in water depths ranging from 300 m to 499 m, 2 inter-connected manifolds and a 26” export pipeline to be connected into the Scarab/Saffron facilities | * Consist of long distance subsea tiebacks between 8 subsea production wells located in water depths ranging from 300 m to 499 m, 2 inter-connected manifolds and a 26” export pipeline to be connected into the Scarab/Saffron facilities | ||
* The field delivers gas to the [[ELNG Idco LNG Terminal]] | * The field delivers gas to the [[ELNG Idco LNG Terminal]] | ||
− | + | === Contractors === | |
* **Technip:** Long distance subsea tiebacks between 8 subsea production wells, 2 inter-connected manifolds and a 26” export pipeline | * **Technip:** Long distance subsea tiebacks between 8 subsea production wells, 2 inter-connected manifolds and a 26” export pipeline | ||
− | + | === History === | |
* 2000 - The first appraisal Sapphire-1 tested 35 million standard cubic feet of gas per day (mmscfd) and 1,100 barrels of condensate per day (bcpd) | * 2000 - The first appraisal Sapphire-1 tested 35 million standard cubic feet of gas per day (mmscfd) and 1,100 barrels of condensate per day (bcpd) | ||
* 2003 - Technip awarded subsea contract | * 2003 - Technip awarded subsea contract | ||
* 2005 - First gas produced | * 2005 - First gas produced | ||
+ | * 2015 - Shell acquired BG Group and became the operator | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
# [http://killajoules.wikidot.com/archive:new-contract-award-in-egypt-for-the-subsea-developme/ New contract award in Egypt for the subsea development of the Sapphire offshore gas field] | # [http://killajoules.wikidot.com/archive:new-contract-award-in-egypt-for-the-subsea-developme/ New contract award in Egypt for the subsea development of the Sapphire offshore gas field] | ||
# [http://killajoules.wikidot.com/archive:sapphire-3-successful-appraisal-well Sapphire-3 Successful Appraisal Well] | # [http://killajoules.wikidot.com/archive:sapphire-3-successful-appraisal-well Sapphire-3 Successful Appraisal Well] | ||
# [http://killajoules.wikidot.com/archive:bg-international-announces-gas-and-condensate-discov/ BG International Announces Gas and Condensate Discovery Offshore Egypt] | # [http://killajoules.wikidot.com/archive:bg-international-announces-gas-and-condensate-discov/ BG International Announces Gas and Condensate Discovery Offshore Egypt] | ||
+ | # [https://abarrelfull.blogspot.com/2023/09/recommended-cash-and-share-offer-for-bg.html Recommended cash and share offer for BG Group by Royal Dutch Shell] | ||
+ | |||
+ | [[category:Field]] | ||
+ | [[category:Egypt]] | ||
+ | [[category:Shell]] |
Revision as of 06:49, 17 October 2023
Summary Information
- Operator: BG Group
- Country: Egypt
- Location: 74 km from the Nile Delta shoreline
- Production start: 2005
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The Sapphire field is located 74 km from the Nile Delta shoreline, south west of the Simian field
- Consist of long distance subsea tiebacks between 8 subsea production wells located in water depths ranging from 300 m to 499 m, 2 inter-connected manifolds and a 26” export pipeline to be connected into the Scarab/Saffron facilities
- The field delivers gas to the ELNG Idco LNG Terminal
Contractors
- **Technip:** Long distance subsea tiebacks between 8 subsea production wells, 2 inter-connected manifolds and a 26” export pipeline
History
- 2000 - The first appraisal Sapphire-1 tested 35 million standard cubic feet of gas per day (mmscfd) and 1,100 barrels of condensate per day (bcpd)
- 2003 - Technip awarded subsea contract
- 2005 - First gas produced
- 2015 - Shell acquired BG Group and became the operator