Sangomar Oil and Gas Field

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: Woodside
  • Country: Senegal
  • Location:
  • Production start: 2023 (expected)
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The Sangomar Field Development Phase 1 will comprise a stand-alone FPSO with a production capacity of approximately 100,000 barrels per day, 23 subsea wells and supporting subsea infrastructure.

Contractors

  • -

History

Geology

Links