Difference between revisions of "Sangomar Oil and Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) (→Links) |
||
Line 28: | Line 28: | ||
=== Links === | === Links === | ||
# [https://abarrelfull.blogspot.com/2021/12/woodside-completes-sangomar-acquisition.html Woodside Completes Sangomar Acquisition From Far] | # [https://abarrelfull.blogspot.com/2021/12/woodside-completes-sangomar-acquisition.html Woodside Completes Sangomar Acquisition From Far] | ||
− | # [ Woodside Awards Subsea Integration Alliance EPCI Contract for Sangomar Field Development Offshore Senegal] | + | # [https://abarrelfull.blogspot.com/2021/12/woodside-awards-subsea-integration.html Woodside Awards Subsea Integration Alliance EPCI Contract for Sangomar Field Development Offshore Senegal] |
Revision as of 12:12, 15 December 2021
Summary Information
- Operator: Woodside
- Country: Senegal
- Location: Offshore, 100 kilometres south of Dakar
- Production start: 2023 (expected)
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The Sangomar Field Development Phase 1 will comprise the Woodside Sangomar FPSO with a production capacity of approximately 100,000 barrels per day, 23 subsea wells and supporting subsea infrastructure.
Contractors
- Modec:
- Front End Engineering Design (FEED)for the FPSO
- FPSO purchase contract
- Sofec: External Turret mooring system
- Subsea 7: provision of 107 km of rigid flowlines, 28 km of flexible risers and jumpers, and 45 km of umbilicals.
- OneSubsea: Supply a portfolio of standard systems including 23 wellhead systems, 11 subsea production trees, 10 water injection trees, 2 gas injection trees, topside controls and intervention tools and life-of-field support
History
- 2021 - Woodside increases its stake in the project to over 80%