Saddlehorn Crude Oil Pipeline
Revision as of 13:18, 3 October 2023 by Abarrelfull (talk | contribs)
Summary Information
- Source: Northeast Colorado
- Destination: Cushing, Oklahoma
- Ownership: Magellan Midstream
- Website: http://www.magellanlp.com/
- Length: kilometres (600 miles)
- Capacity: 200,000 barrels of oil per day
- Crude Type:
+++ Brief Description
- The Saddlehorn Pipeline includes construction of an approximate 600-mile, 20-inch diameter pipeline capable of transporting up to 400,000 barrels per day of crude oil from Platteville, Colorado to Magellan’s storage facilities in Cushing.
- Initial capacity will be 200,000 bpd
- It will transport crude from the Niobrara Shale Oil Field
- In addition, an extension to Carr, CO, will provide access for crude produced in the Carr area
- It is part of a twin system with Grand Mesa Crude Oil Pipeline
+++ Pipeline Status
- In operation
+++ History
- 2014 - Open season launched
- 2015 - Anadarko became a partner
- 2015 - Platteville to Carr extension announced
- 2016 - Pipeline entered operations
+++ Other Information
- -
+++ Links