Difference between revisions of "Saddlehorn Crude Oil Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 6: | Line 6: | ||
* Website: http://www.magellanlp.com/ | * Website: http://www.magellanlp.com/ | ||
* Length: kilometres (600 miles) | * Length: kilometres (600 miles) | ||
− | * Capacity: | + | * Capacity: 290,000 barrels of oil per day |
* Crude Type: | * Crude Type: | ||
Line 14: | Line 14: | ||
* Initial capacity will be 200,000 bpd | * Initial capacity will be 200,000 bpd | ||
* It will transport crude from the [[Niobrara Shale Oil Field]] | * It will transport crude from the [[Niobrara Shale Oil Field]] | ||
− | * In addition, an extension to Carr, CO, | + | * In addition, an extension to Carr, CO, provides access for crude produced in the Carr area |
* It is part of a twin system with [[Grand Mesa Crude Oil Pipeline]] | * It is part of a twin system with [[Grand Mesa Crude Oil Pipeline]] | ||
Line 25: | Line 25: | ||
* 2015 - Platteville to Carr extension announced | * 2015 - Platteville to Carr extension announced | ||
* 2016 - Pipeline entered operations | * 2016 - Pipeline entered operations | ||
+ | * 2017 - Carr, Colorado, to Platteville, Colorado extension completed | ||
+ | * 202 - Capacity was expanded to 290,000 bpd | ||
+++ Other Information | +++ Other Information |
Latest revision as of 13:26, 3 October 2023
Summary Information
- Source: Northeast Colorado
- Destination: Cushing, Oklahoma
- Ownership: Magellan Midstream
- Website: http://www.magellanlp.com/
- Length: kilometres (600 miles)
- Capacity: 290,000 barrels of oil per day
- Crude Type:
+++ Brief Description
- The Saddlehorn Pipeline includes construction of an approximate 600-mile, 20-inch diameter pipeline capable of transporting up to 400,000 barrels per day of crude oil from Platteville, Colorado to Magellan’s storage facilities in Cushing.
- Initial capacity will be 200,000 bpd
- It will transport crude from the Niobrara Shale Oil Field
- In addition, an extension to Carr, CO, provides access for crude produced in the Carr area
- It is part of a twin system with Grand Mesa Crude Oil Pipeline
+++ Pipeline Status
- In operation
+++ History
- 2014 - Open season launched
- 2015 - Anadarko became a partner
- 2015 - Platteville to Carr extension announced
- 2016 - Pipeline entered operations
- 2017 - Carr, Colorado, to Platteville, Colorado extension completed
- 202 - Capacity was expanded to 290,000 bpd
+++ Other Information
- -
+++ Links