Difference between revisions of "Saddlehorn Crude Oil Pipeline"

From A Barrel Full
Jump to navigation Jump to search
 
Line 6: Line 6:
 
* Website: http://www.magellanlp.com/
 
* Website: http://www.magellanlp.com/
 
* Length:  kilometres (600 miles)  
 
* Length:  kilometres (600 miles)  
* Capacity: 200,000 barrels of oil per day  
+
* Capacity: 290,000 barrels of oil per day  
 
* Crude Type:
 
* Crude Type:
  
Line 14: Line 14:
 
* Initial capacity will be 200,000 bpd
 
* Initial capacity will be 200,000 bpd
 
* It will transport crude from the [[Niobrara Shale Oil Field]]
 
* It will transport crude from the [[Niobrara Shale Oil Field]]
* In addition, an extension to Carr, CO, will provide access for crude produced in the Carr area
+
* In addition, an extension to Carr, CO, provides access for crude produced in the Carr area
 
* It is part of a twin system with [[Grand Mesa Crude Oil Pipeline]]
 
* It is part of a twin system with [[Grand Mesa Crude Oil Pipeline]]
  
Line 25: Line 25:
 
* 2015 - Platteville to Carr extension announced
 
* 2015 - Platteville to Carr extension announced
 
* 2016 - Pipeline entered operations
 
* 2016 - Pipeline entered operations
 +
* 2017 - Carr, Colorado, to Platteville, Colorado extension completed
 +
* 202 - Capacity was expanded to 290,000 bpd
  
 
+++ Other Information
 
+++ Other Information

Latest revision as of 13:26, 3 October 2023

Summary Information

  • Source: Northeast Colorado
  • Destination: Cushing, Oklahoma
  • Ownership: Magellan Midstream
  • Website: http://www.magellanlp.com/
  • Length: kilometres (600 miles)
  • Capacity: 290,000 barrels of oil per day
  • Crude Type:

+++ Brief Description

  • The Saddlehorn Pipeline includes construction of an approximate 600-mile, 20-inch diameter pipeline capable of transporting up to 400,000 barrels per day of crude oil from Platteville, Colorado to Magellan’s storage facilities in Cushing.
  • Initial capacity will be 200,000 bpd
  • It will transport crude from the Niobrara Shale Oil Field
  • In addition, an extension to Carr, CO, provides access for crude produced in the Carr area
  • It is part of a twin system with Grand Mesa Crude Oil Pipeline

+++ Pipeline Status

  • In operation

+++ History

  • 2014 - Open season launched
  • 2015 - Anadarko became a partner
  • 2015 - Platteville to Carr extension announced
  • 2016 - Pipeline entered operations
  • 2017 - Carr, Colorado, to Platteville, Colorado extension completed
  • 202 - Capacity was expanded to 290,000 bpd

+++ Other Information

  • -

+++ Links

  1. EIA Liquids Pipeline Projects 2015-2020
  2. Magellan Midstream Proceeding with Saddlehorn Pipeline, Open Season Extended through Nov. 20
  3. Anadarko Joins Magellan Midstream and Plains All American to Build Saddlehorn Pipeline
  4. Saddlehorn Pipeline to Add New Origin at Carr, CO