Difference between revisions of "Saddlehorn Crude Oil Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Source: Northeast Colorado * Destination: Cushing, Oklahoma * Ownership: Magellan Midstream * Website: http://www.magellanlp.com/ * Length: kilometres...") |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 6: | Line 6: | ||
* Website: http://www.magellanlp.com/ | * Website: http://www.magellanlp.com/ | ||
* Length: kilometres (600 miles) | * Length: kilometres (600 miles) | ||
− | * Capacity: | + | * Capacity: 290,000 barrels of oil per day |
* Crude Type: | * Crude Type: | ||
Line 14: | Line 14: | ||
* Initial capacity will be 200,000 bpd | * Initial capacity will be 200,000 bpd | ||
* It will transport crude from the [[Niobrara Shale Oil Field]] | * It will transport crude from the [[Niobrara Shale Oil Field]] | ||
− | * In addition, an extension to Carr, CO, | + | * In addition, an extension to Carr, CO, provides access for crude produced in the Carr area |
+ | * It is part of a twin system with [[Grand Mesa Crude Oil Pipeline]] | ||
+++ Pipeline Status | +++ Pipeline Status | ||
− | * | + | * In operation |
+++ History | +++ History | ||
Line 23: | Line 24: | ||
* 2015 - Anadarko became a partner | * 2015 - Anadarko became a partner | ||
* 2015 - Platteville to Carr extension announced | * 2015 - Platteville to Carr extension announced | ||
+ | * 2016 - Pipeline entered operations | ||
+ | * 2017 - Carr, Colorado, to Platteville, Colorado extension completed | ||
+ | * 202 - Capacity was expanded to 290,000 bpd | ||
+++ Other Information | +++ Other Information | ||
Line 29: | Line 33: | ||
+++ Links | +++ Links | ||
− | + | # [[EIA Liquids Pipeline Projects 2015-2020]] | |
# [http://killajoules.wikidot.com/blog:5547 Magellan Midstream Proceeding with Saddlehorn Pipeline, Open Season Extended through Nov. 20] | # [http://killajoules.wikidot.com/blog:5547 Magellan Midstream Proceeding with Saddlehorn Pipeline, Open Season Extended through Nov. 20] | ||
# [http://killajoules.wikidot.com/archive:anadarko-joins-magellan-midstream-and-plains-all-ame Anadarko Joins Magellan Midstream and Plains All American to Build Saddlehorn Pipeline] | # [http://killajoules.wikidot.com/archive:anadarko-joins-magellan-midstream-and-plains-all-ame Anadarko Joins Magellan Midstream and Plains All American to Build Saddlehorn Pipeline] | ||
# [http://killajoules.wikidot.com/archive:saddlehorn-pipeline-to-add-new-origin-at-carr-co Saddlehorn Pipeline to Add New Origin at Carr, CO] | # [http://killajoules.wikidot.com/archive:saddlehorn-pipeline-to-add-new-origin-at-carr-co Saddlehorn Pipeline to Add New Origin at Carr, CO] |
Latest revision as of 13:26, 3 October 2023
Summary Information
- Source: Northeast Colorado
- Destination: Cushing, Oklahoma
- Ownership: Magellan Midstream
- Website: http://www.magellanlp.com/
- Length: kilometres (600 miles)
- Capacity: 290,000 barrels of oil per day
- Crude Type:
+++ Brief Description
- The Saddlehorn Pipeline includes construction of an approximate 600-mile, 20-inch diameter pipeline capable of transporting up to 400,000 barrels per day of crude oil from Platteville, Colorado to Magellan’s storage facilities in Cushing.
- Initial capacity will be 200,000 bpd
- It will transport crude from the Niobrara Shale Oil Field
- In addition, an extension to Carr, CO, provides access for crude produced in the Carr area
- It is part of a twin system with Grand Mesa Crude Oil Pipeline
+++ Pipeline Status
- In operation
+++ History
- 2014 - Open season launched
- 2015 - Anadarko became a partner
- 2015 - Platteville to Carr extension announced
- 2016 - Pipeline entered operations
- 2017 - Carr, Colorado, to Platteville, Colorado extension completed
- 202 - Capacity was expanded to 290,000 bpd
+++ Other Information
- -
+++ Links