Sabal Trail Natural Gas Pipeline Project

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Source: Tallapoosa County, Alabama
  • Destination: Central Florida Hub near Orlando
  • Ownership: Enbridge and NextEra Energy, Inc.
  • Website: http://www.sabaltrailtransmission.com/
  • Length: kilometres (462 miles)
  • Capacity: 1 billion cubic feet per day
  • Status: Planned

+++ Details

  • The Sabal Trail pipeline includes approximately 465 miles of interstate natural gas pipeline (55 miles in Alabama, 196 miles in Georgia, and 214 miles in Florida) and initially at least 2 compressor stations in Alabama and Florida.
  • The pipeline is capable of transporting 1 billion cubic feet per day or more of natural gas to serve local distribution companies, industrial users and natural gas-fired power generators in the Southeast markets.

+++ History

  • 2013 - Spectra Energy awarded pipeline contract
  • 2017 - Enbridge became a partner when it acquired Spectra
  • 2017 - Pipeline entered service

+++ Other Information

  • -

+++ Links

  1. Spectra Energy To Construct $3 Billion Interstate Pipeline into Florida
  2. Enbridge and Spectra Energy Complete Merger