Difference between revisions of "S Oil Ulsan Refinery Residue Upgrading Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 31: | Line 31: | ||
=== History === | === History === | ||
* 2014 - Foster Wheeler wins FEED for Upgrade Project | * 2014 - Foster Wheeler wins FEED for Upgrade Project | ||
+ | * 2015 - Axens chosen for process units technologies | ||
* 2018 - The project is completed | * 2018 - The project is completed | ||
+ | |||
=== Other Information === | === Other Information === | ||
- | - |
Revision as of 16:03, 23 March 2020
Contents
Summary Information
- Ownership: S Oil (Saudi Aramco and Hanjin Group)
- Website: http://www.s-oil.com/
- Wiki Page: S-Oil Ulsan Refinery
- Location: Ulsan, South Korea
- Capacity: 33,5 million tons/annum & 669,000 bbl/day
- Nelson Complexity:
- Project Stage: Completed 2018
- Budget:
The Project
- Project Type: Upgrade of existing refinery
- Project Summary: The upgrade of the refinery includes the addition of a residue hydrodesulfurization unit, a residue fluid catalytic cracker and multiple downstream upgrading units to enable the refinery to produce more higher value products and, in particular, maximize production of polymer-grade propylene.
- Main Contractors
- Foster Wheeler: Front-end engineering design (FEED)
- Licences:
- Axens: Atmospheric residue desulfurization unit (Hyvahl™), High Severity FCC unit (HS-FCC™), LPG extractive sweetening unit (Sulfrex™), Gasoline desulfurization unit (Prime-G+™), A C4-stream processing section including a C4 selective hydrogenation unit, a MTBE unit, a super-fractionator and a butane isomerization unit.
Refining Units
- Residue Hydrodesulfurization Unit
- Residue fluid catalytic cracker
- Gasoline desulphurisation
- LPG desulphurisation
- Isomerization
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
- There is no change to the crude supply
Products Produced
- Gasoline, , LPG, Polymer-grade propylene
History
- 2014 - Foster Wheeler wins FEED for Upgrade Project
- 2015 - Axens chosen for process units technologies
- 2018 - The project is completed
Other Information
-