SEKCO Oil Pipeline

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Source: Lucius Oil Field
  • Destination: South Marsh Island
  • Ownership: Enterprise, Genesis
  • Website: http://www.enterpriseproducts.com/
  • Length: kilometres (149 miles)
  • Capacity: 115,000 barrels of oil per day
  • Crude Type:

+++ Brief Description

  • The 149-mile, 18-inch diameter SEKCO Oil Pipeline is being designed with a capacity of 115,000 barrels per day (“BPD”) and would connect the Lucius Oil Field-truss spar floating production platform to an existing junction platform at South Marsh Island 205 that is part of the Enterprise-operated Poseidon Oil Pipeline system.

+++ Pipeline Status

  • In operation

+++ History

  • 2012 - Enterprise and Genesis Energy agree to build Sekco Oil Pipeline
  • 2014 - Pipeline completed

+++ Other Information

  • -

+++ Links

  1. Enterprise and Genesis Energy to Build Crude Oil Gathering Pipeline in the Deepwater Gulf of Mexico
  2. Enterprise and Genesis Complete Crude Oil Pipeline in the Deepwater Gulf of Mexico