SAGE St Fergus Gas Processing Terminal

From A Barrel Full
Revision as of 12:29, 22 September 2022 by Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: Apache * Website: http://www.apachecorp.com/ * Location: St Fergus, Scotland * Capacity: 1990 mmscfd +++ Brief Description * The ter...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

+++ Brief Description

  • The terminal is fed by the [[[Scottish Area Gas Evacuation (SAGE) Pipeline]]] and the [[[Britannia Gas Pipeline]]]
  • The SAGE Terminal nominal capacity is:
* 1990 mmscfd (millions of standard cubic feet a day), 
* 5,300 tonnes/day Natural Gas Liquids (NGLs), 
* 2500 tonnes/day CO2 removal, 
* design H2S treatment to 1 ppm.  
  • Gas capacity is split between 3 processing trains
  • Train 3 processes feed gas from the Britannia pipeline only

++++ Related Oil and Gas Fields

+++ Ongoing Projects

  • -

+++ Other Information

  • -

+++ History

  • 1992 - Gas exports started from Beryl
  • 1993 - First delivers from Scott
  • 1994 - Brae began supplying gas
  • 1996 - Contract awarded for expansion project
  • 1998 - First gas from Britannia
  • 2011 - Apache acquired the terminal from Mobil

Links

  1. SAGE Terminal Description, Apache
  2. Fluor Daniel Awarded Contract By Mobil North Sea Limited
  3. Apache Completes Acquisition of ExxonMobil's Beryl Field, Other UK North Sea Assets