Abarrelfull (talk | contribs) (Created page with "Summary Information Ownership: Takreer (Abu Dhabi National Oil Company) Website: http://www.takreer.com/ Wiki Page: Al Ruwais Refinery Location: Ruwais, Abu Dhabi Capacity: 20...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
− | Ownership: Takreer (Abu Dhabi National Oil Company) | + | * Ownership: Takreer (Abu Dhabi National Oil Company) |
− | Website: http://www.takreer.com/ | + | * Website: http://www.takreer.com/ |
− | Wiki Page: Al Ruwais Refinery | + | * Wiki Page: Al Ruwais Refinery |
− | Location: Ruwais, Abu Dhabi | + | * Location: Ruwais, Abu Dhabi |
− | Capacity: 20 million tons/annum & 400,000 bbl/day | + | * Capacity: 20 million tons/annum & 400,000 bbl/day |
− | Nelson Complexity: | + | * Nelson Complexity: |
− | Project Stage: Completed | + | * Project Stage: Completed 2015 |
− | + | * Budget: $10 Billion | |
− | Budget: $10 Billion | + | === The Project === |
− | The Project | + | * Project Type: Expansion / Upgrade |
− | Project Type: Expansion / Upgrade | + | * Project Summary: The company will raise its refining capacity at the site by 400,000 barrels a day (b/d), by constructing the new refinery to operate alongside the existing 417,000-b/d facility. |
− | Project Summary: The company will raise its refining capacity at the site by 400,000 barrels a day (b/d), by constructing the new refinery to operate alongside the existing 417,000-b/d facility. | + | * Main Contractors: |
− | Main Contractors: | + | ** Foster Wheeler: Detailed feasibility study |
− | Foster Wheeler: Detailed feasibility study | + | ** Shaw, |
− | Shaw, | + | ** GS Engineering and Construction: Packages II and VII - RFCC and Port |
− | GS Engineering and Construction: Packages II and VII - RFCC and Port | + | ** Samsung Engineering Co. Ltd. : EPC on a LSTK (lump sum turn-key) basis for package number 3 - Utilities |
− | Samsung Engineering Co. Ltd. : EPC on a LSTK (lump sum turn-key) basis for package number 3 - Utilities | + | ** Daewoo Engineering '&' Construction: Tank Farm |
− | Daewoo Engineering '&' Construction: Tank Farm | + | * Licences: |
− | Licences: | + | ** UOP: Unicracking, Distillate Unionfining, Merox, BenSat and Naphtha Hydrotreating licences |
− | UOP: Unicracking, Distillate Unionfining, Merox, BenSat and Naphtha Hydrotreating licences | + | ** Axens: RFCC, LPG treatment, Isomerization and Prime-G+ |
− | Axens: RFCC, LPG treatment, Isomerization and Prime-G+ | + | === Refining Units === |
− | Refining Units | + | * Unsaturated LPG treatment unit – 59,800 bbl/day |
− | Unsaturated LPG treatment unit – 59,800 bbl/day | + | * C4-cut purification system – 37,800 bbl/day |
− | C4-cut purification system – 37,800 bbl/day | + | * Residue fluid catalytic cracker (RFCC) - 127,100 bbl/day |
− | Residue fluid catalytic cracker (RFCC) - 127,100 bbl/day | + | * Butane Isomerization unit – 26,000 bbl/day |
− | Butane Isomerization unit – 26,000 bbl/day | + | * Naphtha hydrotreater – 40,930 bbl/day |
− | Naphtha hydrotreater – 40,930 bbl/day | + | * Delayed Coker |
− | Delayed Coker | + | * Slurry Hydro-desulphurization Unit |
− | Slurry Hydro-desulphurization Unit | + | * Carbon Black Unit |
− | Carbon Black Unit | + | * Distillate Hydro Treating Unit |
− | Distillate Hydro Treating Unit | + | * Propane Dehydrogenation Unit |
− | Propane Dehydrogenation Unit | + | * Coke calcification Unit |
− | Coke calcification Unit | + | === Terminal Capacity === |
− | Terminal Capacity | + | * Consists of 76 tanks and able to store 4,493,031 m3 |
− | Consists of 76 tanks and able to store 4,493,031 m3 | + | === Crude Supply === |
− | Crude Supply | + | * Domestic Crude |
− | Domestic Crude | + | === Products Produced === |
− | Products Produced | + | * The refinery will produce propylene, unleaded gasoline, naphtha, liquefied petroleum gas (LPG), aviation turbine fuel, kerosene, gas-oil & bunker fuel |
− | The refinery will produce propylene, unleaded gasoline, naphtha, liquefied petroleum gas (LPG), aviation turbine fuel, kerosene, gas-oil & bunker fuel | + | === History === |
− | History | + | * 2006 - Foster Wheeler awarded feasibility study |
− | 2006 - Foster Wheeler awarded feasibility study | + | * 2008 - UOP chosen for clean fuels technology licences |
− | 2008 - UOP chosen for clean fuels technology licences | + | * 2008 - Axens awarded RFCC and related units |
− | 2008 - Axens awarded RFCC and related units | + | * 2009 - Daewoo awarded tank farm package |
− | 2009 - Daewoo awarded tank farm package | + | * 2010 - EPC contracts awarded for major construction packages |
− | 2010 - EPC contracts awarded for major construction packages | + | * 2011 - Front End Engineering and Design (FEED) and license packages for Carbon Black & Delayed Coker Awarded |
− | 2011 - Front End Engineering and Design (FEED) and license packages for Carbon Black & Delayed Coker Awarded | + | * 2015 - The project was completed |
− | 2015 - The project was completed | + | === Other Information === |
− | Other Information | ||
- | - | ||
=== Links === | === Links === |
Revision as of 09:36, 16 March 2020
Contents
Summary Information
- Ownership: Takreer (Abu Dhabi National Oil Company)
- Website: http://www.takreer.com/
- Wiki Page: Al Ruwais Refinery
- Location: Ruwais, Abu Dhabi
- Capacity: 20 million tons/annum & 400,000 bbl/day
- Nelson Complexity:
- Project Stage: Completed 2015
- Budget: $10 Billion
The Project
- Project Type: Expansion / Upgrade
- Project Summary: The company will raise its refining capacity at the site by 400,000 barrels a day (b/d), by constructing the new refinery to operate alongside the existing 417,000-b/d facility.
- Main Contractors:
- Foster Wheeler: Detailed feasibility study
- Shaw,
- GS Engineering and Construction: Packages II and VII - RFCC and Port
- Samsung Engineering Co. Ltd. : EPC on a LSTK (lump sum turn-key) basis for package number 3 - Utilities
- Daewoo Engineering '&' Construction: Tank Farm
- Licences:
- UOP: Unicracking, Distillate Unionfining, Merox, BenSat and Naphtha Hydrotreating licences
- Axens: RFCC, LPG treatment, Isomerization and Prime-G+
Refining Units
- Unsaturated LPG treatment unit – 59,800 bbl/day
- C4-cut purification system – 37,800 bbl/day
- Residue fluid catalytic cracker (RFCC) - 127,100 bbl/day
- Butane Isomerization unit – 26,000 bbl/day
- Naphtha hydrotreater – 40,930 bbl/day
- Delayed Coker
- Slurry Hydro-desulphurization Unit
- Carbon Black Unit
- Distillate Hydro Treating Unit
- Propane Dehydrogenation Unit
- Coke calcification Unit
Terminal Capacity
- Consists of 76 tanks and able to store 4,493,031 m3
Crude Supply
- Domestic Crude
Products Produced
- The refinery will produce propylene, unleaded gasoline, naphtha, liquefied petroleum gas (LPG), aviation turbine fuel, kerosene, gas-oil & bunker fuel
History
- 2006 - Foster Wheeler awarded feasibility study
- 2008 - UOP chosen for clean fuels technology licences
- 2008 - Axens awarded RFCC and related units
- 2009 - Daewoo awarded tank farm package
- 2010 - EPC contracts awarded for major construction packages
- 2011 - Front End Engineering and Design (FEED) and license packages for Carbon Black & Delayed Coker Awarded
- 2015 - The project was completed
Other Information
-
Links
- Bidding Process Launched
- Foster Wheeler Awarded UAE Refinery Feasibility Studies by Takreer
- Axens Awarded Basic Engineering Design and Licenses for the Takreer Ruwais Refinery Expansion Project
- Samsung Engineering signs official contract for a $2.7 billion USD refinery plant order in the UAE
- Daewoo E&C Wins Ruwais Refinery Expansion Project Worth USD 1.17 Billion from UAE
- Korean Builders Win Record Refinery Deals in UAE
- UOP Technology Selected by Abu Dhabi Oil Refining Company for Refinery Expansion in United Arab Emirates
- Adnoc News
- Honeywell UOP To Supply Its 1,000th Hydrogen Purification System