Difference between revisions of "Ruwais Refinery Crude Flexibility Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Ownership: | + | * Ownership: ADNOC Refining |
− | Website: | + | * Website: https://www.adnoc.ae/ |
− | Wiki Page: Al Ruwais Refinery | + | * Wiki Page: [[Al-Ruwais Refinery]] |
− | Location: | + | * Location: 240 kilometers west of Abu Dhabi City |
− | Capacity: million tons/annum & bbl/day | + | * Capacity: 41 million tons/annum & 820,000 bbl/day |
− | Nelson Complexity: | + | * Nelson Complexity: |
− | Project Stage: | + | * Project Stage: Under construction |
− | Expected Completion: | + | * Expected Completion: 2023 |
− | Budget: | + | * Budget: |
=== The Project === | === The Project === | ||
− | Project Type: Upgrade | + | * Project Type: Upgrade |
− | Project Summary: The project will upgrade the Ruwais Refinery to process heavier offshore crude oil from Upper Zakum Oil Field | + | * Project Summary: The project will upgrade the Ruwais Refinery to process heavier offshore crude oil from Upper Zakum Oil Field |
=== Main Contractors === | === Main Contractors === | ||
− | WorleyParsons: Project management consultancy (PMC) | + | * WorleyParsons: Project management consultancy (PMC) |
− | CB&I / Samsung Engineering: | + | * CB&I / Samsung Engineering: |
− | Engineering and procurement for two atmospheric residue desulfurization units | + | ** Engineering and procurement for two atmospheric residue desulfurization units |
− | Engineering, procurement, fabrication and construction for 14 flat-bottom tanks and ten process heaters | + | ** Engineering, procurement, fabrication and construction for 14 flat-bottom tanks and ten process heaters |
− | Chevron Lummus Global: Licence for atmospheric residue desulfurisation units | + | * Chevron Lummus Global: Licence for atmospheric residue desulfurisation units |
=== Refining Units === | === Refining Units === | ||
− | Atmospheric residue desulfurisation units | + | * Atmospheric residue desulfurisation units |
=== Terminal Capacity === | === Terminal Capacity === | ||
− | Crude Oil: | + | * Crude Oil: |
− | Refined Products: | + | * Refined Products: |
=== Crude Supply === | === Crude Supply === | ||
− | The project will enable the refinery to switch from processing condensate to crude from Upper Zakum Oil Field | + | * The project will enable the refinery to switch from processing condensate to crude from Upper Zakum Oil Field |
=== Products Produced === | === Products Produced === | ||
- | - | ||
=== History === | === History === | ||
− | 2018 - WorleyParsons awarded the project management consultancy (PMC) contract | + | * 2018 - WorleyParsons awarded the project management consultancy (PMC) contract |
+ | * 2018 - Samsung Engineering awarded contract for Atmospheric Residue De-Sulfurization | ||
+ | |||
=== Other Information === | === Other Information === | ||
- | - | ||
=== Links === | === Links === | ||
− | ADNOC Refining awards PMC for the Crude Flexibility Project at the Ruwais Refinery | + | # [https://abarrelfull.blogspot.com/2023/01/samsung-engineering-awarded-31-billion.html Samsung Engineering awarded $ 3.1 billion ADNOC refinery project] |
− | CB&I Awarded Contract for ADNOC Refining Crude Flexibility Project | + | # [http://killajoules.wikidot.com/archive:adnoc-refining-has-awarded-worleyparsons-the-project ADNOC Refining awards PMC for the Crude Flexibility Project at the Ruwais Refinery] |
+ | # [http://killajoules.wikidot.com/archive:cb-i-awarded-contract-for-adnoc-refining-crude-flexi CB&I Awarded Contract for ADNOC Refining Crude Flexibility Project] | ||
+ | |||
+ | [[category:Refinery]] | ||
+ | [[category:UAE]] | ||
+ | [[category:ADNOC]] |
Latest revision as of 12:51, 30 January 2023
Contents
Summary Information
- Ownership: ADNOC Refining
- Website: https://www.adnoc.ae/
- Wiki Page: Al-Ruwais Refinery
- Location: 240 kilometers west of Abu Dhabi City
- Capacity: 41 million tons/annum & 820,000 bbl/day
- Nelson Complexity:
- Project Stage: Under construction
- Expected Completion: 2023
- Budget:
The Project
- Project Type: Upgrade
- Project Summary: The project will upgrade the Ruwais Refinery to process heavier offshore crude oil from Upper Zakum Oil Field
Main Contractors
- WorleyParsons: Project management consultancy (PMC)
- CB&I / Samsung Engineering:
- Engineering and procurement for two atmospheric residue desulfurization units
- Engineering, procurement, fabrication and construction for 14 flat-bottom tanks and ten process heaters
- Chevron Lummus Global: Licence for atmospheric residue desulfurisation units
Refining Units
- Atmospheric residue desulfurisation units
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
- The project will enable the refinery to switch from processing condensate to crude from Upper Zakum Oil Field
Products Produced
-
History
- 2018 - WorleyParsons awarded the project management consultancy (PMC) contract
- 2018 - Samsung Engineering awarded contract for Atmospheric Residue De-Sulfurization
Other Information
-