Difference between revisions of "Ruwais LNG Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Ownership: | + | * Ownership: ADNOC |
− | * Website: | + | * Website: https://www.adnoc.ae/ |
− | * Location: | + | * Location: Al Ruwais Industrial City, Al Dhafrah, Abu Dhabi |
* Capacity: million tons/annum | * Capacity: million tons/annum | ||
* Status: Planned | * Status: Planned | ||
=== Brief Description === | === Brief Description === | ||
− | * | + | * The Ruwais LNG project consists of two 4.8 million metric tons per annum (mtpa) natural gas liquefaction trains with a total capacity of 9.6 mtpa of LNG. |
=== Technical Details === | === Technical Details === |
Revision as of 09:17, 13 October 2023
Contents
Summary Information
- Ownership: ADNOC
- Website: https://www.adnoc.ae/
- Location: Al Ruwais Industrial City, Al Dhafrah, Abu Dhabi
- Capacity: million tons/annum
- Status: Planned
Brief Description
- The Ruwais LNG project consists of two 4.8 million metric tons per annum (mtpa) natural gas liquefaction trains with a total capacity of 9.6 mtpa of LNG.
Technical Details
- Storage capacity:
- Constructor:
- Baker Hughes: Provision two electric liquefaction systems
- Licensor:
Ongoing Projects/Project Status
- Commissioning is expected in 202X
Suppliers / Customers
- Suppliers:
- Customers:
History
- -
Other Information
- -