Difference between revisions of "Ross and Blake Oil Fields"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Operator: Talisman * Country: UK * Location: 64 miles from Aberdeen in the Outer Moray Firth * Production start: 1999 * Partners: BG Group * Type: Oil &...")
 
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
 
Summary Information
 
Summary Information
* Operator: Talisman
+
* Operator: Repsol
 
* Country: UK
 
* Country: UK
 
* Location: 64 miles from Aberdeen in the Outer Moray Firth
 
* Location: 64 miles from Aberdeen in the Outer Moray Firth
Line 12: Line 12:
 
* The fields are produced using the [[Bleo Holm FPSO]], which is located on the Ross Field
 
* The fields are produced using the [[Bleo Holm FPSO]], which is located on the Ross Field
 
* Gas is transported to the [[FUKA St Fergus Gas Processing Terminal]] by the [[Frigg UK Gas Pipeline System]]
 
* Gas is transported to the [[FUKA St Fergus Gas Processing Terminal]] by the [[Frigg UK Gas Pipeline System]]
* The Blake development comprises six production wells drilled from a single drill centre, and two water injection wells, north-west and south-east of this drill centre; a production manifold, subsea wellheads and flowlines of 9.5 km connecting it to the FPSO
+
* The Blake development comprises six production wells drilled from a single drill centre, and two water injection wells, north-west and south-east of this drill centre; a production manifold, subsea wellheads and flowlines of 9.5 km connecting it to the [[Bleo Holm FPSO]]
 
* The Blake Flank development comprises two production wells and a single water injector tied into the existing Blake Production Manifold
 
* The Blake Flank development comprises two production wells and a single water injector tied into the existing Blake Production Manifold
  
Line 33: Line 33:
 
* 2002 - Blake Flank project approved
 
* 2002 - Blake Flank project approved
 
* 2003 - Blake Flank came onstream
 
* 2003 - Blake Flank came onstream
 
+
* 2015 - Repsol became a partner by acquiring Talisman Sinopec
  
 
+++ Geology
 
+++ Geology
Line 46: Line 46:
 
# [http://killajoules.wikidot.com/archive:blake-flank-oil-development-receives-dti-go-ahead Blake Flank Oil Development Receives DTI Go-Ahead]
 
# [http://killajoules.wikidot.com/archive:blake-flank-oil-development-receives-dti-go-ahead Blake Flank Oil Development Receives DTI Go-Ahead]
 
# [http://killajoules.wikidot.com/archive:bg-announces-first-production-from-blake-flank-oil-d BG announces first production from Blake Flank oil development]
 
# [http://killajoules.wikidot.com/archive:bg-announces-first-production-from-blake-flank-oil-d BG announces first production from Blake Flank oil development]
 +
# [https://abarrelfull.blogspot.com/2023/10/repsol-reaches-agreement-with-talisman.html Repsol reaches an agreement with Talisman Energy to acquire the Canadian oil company]

Latest revision as of 14:25, 23 November 2023

Summary Information

  • Operator: Repsol
  • Country: UK
  • Location: 64 miles from Aberdeen in the Outer Moray Firth
  • Production start: 1999
  • Partners: BG Group
  • Type: Oil & Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • The fields are produced using the Bleo Holm FPSO, which is located on the Ross Field
  • Gas is transported to the FUKA St Fergus Gas Processing Terminal by the Frigg UK Gas Pipeline System
  • The Blake development comprises six production wells drilled from a single drill centre, and two water injection wells, north-west and south-east of this drill centre; a production manifold, subsea wellheads and flowlines of 9.5 km connecting it to the Bleo Holm FPSO
  • The Blake Flank development comprises two production wells and a single water injector tied into the existing Blake Production Manifold

+++ Contractors

  • **McNulty Offshore:** FPSO conversion
  • **Coflexip Stena:** offshore facilities
  • **Santa Fe:** drilling

++++ Blake Flank

  • **Technip:** Design, fabrication and installation of the subsea flowlines and umbilicals
  • **Kvaerner:** The subsea controls
  • **Cameron Cooper:** Subsea Christmas trees
  • **Santa Fe:** drilling

+++ History

  • 1997 - Ross Project development approved by UK Government
  • 1999 - The Ross field came onstream
  • 2000 - Blake Project development approved by UK Government
  • 2001 - Production started on the Blake field
  • 2002 - Blake Flank project approved
  • 2003 - Blake Flank came onstream
  • 2015 - Repsol became a partner by acquiring Talisman Sinopec

+++ Geology

  • The main Blake reservoir is a thick channel sand

+++ Links

  1. Bibby Offshore Subsea References
  2. Talisman Announces Blake Field Development Approval
  3. FPSO technology benefits Ross and Blake oil fields
  4. Blake Oil Field On Stream Ahead Of Schedule
  5. The Blake Field, Offshore Petroleum Production And Pipe-Lines (Assessment Of Environmental Effects) Regulations 1999 Licences P 101, P 729 And P 810 - Licences Having Effect Under The Petroleum Act 1998
  6. Blake Flank Oil Development Receives DTI Go-Ahead
  7. BG announces first production from Blake Flank oil development
  8. Repsol reaches an agreement with Talisman Energy to acquire the Canadian oil company