Rose Bank FPSO

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Name:
  • Field: Rose Bank Oil and Gas Field
  • Country:
  • Ownership:
  • Website:
  • Field Operated By: Chevron
  • Capacity: 100,000 bpd
  • Year of Completion: Expected 2016

+++ Brief Description

  • The FPSO, measuring 292 m in length, 57 m in width, and 30 m in depth
  • The vessel will be able to produce 100,000 barrels of oil and 190 million standard cubic feet of natural gas per day.
  • It will also have storage capacity for 1.05 million barrels of oil.
  • The 99,750-tonne turret moored FPSO is scheduled to be handed over by the end of November 2016.

+++ Contractors

  • **Hyundai Heavy:** Engineering, procurement, and construction for the FPSO
  • **Bluewater Energy Services:** Engineering, procurement, construction and integration (EPCI) of the Turret and Mooring System

+++ Status

  • -

+++ History

  • 2013 - Hyundai Heavy awarded EPC contract
  • 2015 - Bluewater awared turret contract

+++ Other Information

  • -

+++ Links

  1. Hyundai Heavy Industries FPSO References
  2. Hyundai Heavy Clinches USD 1.9 Billion FPSO Order
  3. Bluewater awarded a contract for major Turret Mooring System for Rosebank project