Revithoussa LNG Terminal

From A Barrel Full
Jump to navigation Jump to search

Summary Information

Ownership: DEPA Website: http://www.depa.gr/ Location: Revithoussa Island, Megara Bay – Attica – GREECE Capacity: 2.0 million tons/annum Status: In Operation Technical Details

Storage capacity: 2 tanks of 65.000 m3 LNG useful volume. Unloading capacity: 3.500 m3 LNG / hour. Send out capacity: 270 m3 LNG/hour or 1,4 bcma (S.M.S.R.). 407 m3 LNG/hour or 2,1 bcma (Peak with 1 vaporizer as spare). 533 m3 LNG/hour or 2,5 bcma (Full S.R. without spare). History

2000 - The terminal recieves its first cargo 2007 - Terminal Expanded 2012 - Tender launched for third tank Ongoing Projects/Project Status

A second expansion is under study comprising one additional third LNG tank, one additional truck loading facilities and an increase of the send-out capacity A tender has been launched for the expansion Suppliers / Customers

Suppliers: Algeria, Sonatrach Customers: Other Information

The terminal was built by Sofregaz & Preliminary engineering studies were performed by Tractebel

Links

  1. Terminal Webpage
  2. Revithoussa LNG Terminal Presentation
  3. REVITHOUSSA - GREECE - LNG IMPORT TERMINAL - SECOND EXTENSION
  4. Tractebel Engineering LNG References
  5. Saipem LNG References
  6. EGL Delivers First LNG Cargo To Greece
  7. Notice For an international tender for design and construction of a new LNG Tank in Revithoussa
  8. The Snam, Enagás, Fluxys consortium awarded the tender for the acquisition of 66% of the Greek operator DESFA