Difference between revisions of "Revithoussa LNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
 
(4 intermediate revisions by the same user not shown)
Line 9: Line 9:
 
=== Technical Details ===
 
=== Technical Details ===
  
* Storage capacity: 2 tanks of 65.000 m3 LNG useful volume.
+
* Storage capacity:  
 +
** 2 tanks of 65.000 m3  
 +
** 1 tnks of 95.000-m3
 
* Unloading capacity: 3.500 m3 LNG / hour.
 
* Unloading capacity: 3.500 m3 LNG / hour.
 
* Send out capacity:
 
* Send out capacity:
Line 26: Line 28:
 
=== Ongoing Projects/Project Status ===
 
=== Ongoing Projects/Project Status ===
  
* A second expansion is under study comprising one additional third LNG tank, one additional truck loading facilities and an increase of the send-out capacity
+
* The facility has been expanded twice in 2000 and 2018.
* A tender has been launched for the expansion
+
* The second expansion comprised one additional third LNG tank, one additional truck loading facilities and an increase of the send-out capacity
 +
 
 
=== Suppliers / Customers ===
 
=== Suppliers / Customers ===
  
* Suppliers: Algeria, Sonatrach
+
* Suppliers:  
 +
** Algeria, Sonatrach
 +
** Spot cargos are purchased from the USA
 
* Customers: The terminal is connected to the Greek gas network
 
* Customers: The terminal is connected to the Greek gas network
  
Line 40: Line 45:
 
# [http://www.gie.eu.com/adminmod/show.asp?wat=DEPA%20LNG%20Terminal.ppt  Revithoussa LNG Terminal Presentation]
 
# [http://www.gie.eu.com/adminmod/show.asp?wat=DEPA%20LNG%20Terminal.ppt  Revithoussa LNG Terminal Presentation]
 
# [http://www.sofregaz.fr/en/news/2009/revithoussa-greece-lng-import-terminal-second-extension REVITHOUSSA - GREECE - LNG IMPORT TERMINAL - SECOND EXTENSION]
 
# [http://www.sofregaz.fr/en/news/2009/revithoussa-greece-lng-import-terminal-second-extension REVITHOUSSA - GREECE - LNG IMPORT TERMINAL - SECOND EXTENSION]
 +
# [[Saipem LNG References]]
 
# [[Tractebel Engineering LNG References]]
 
# [[Tractebel Engineering LNG References]]
# [[Saipem LNG References]]
+
# [[Whessoe Engineering LNG References]]
 
# [http://killajoules.wikidot.com/blog:1159 EGL Delivers First LNG Cargo To Greece]
 
# [http://killajoules.wikidot.com/blog:1159 EGL Delivers First LNG Cargo To Greece]
 
# [http://killajoules.wikidot.com/blog:2205 Notice For an international tender for design and construction of a new LNG Tank in Revithoussa]
 
# [http://killajoules.wikidot.com/blog:2205 Notice For an international tender for design and construction of a new LNG Tank in Revithoussa]
 
# [https://abarrelfull.blogspot.com/2021/11/revithoussa-welcomes-first-us-lng-cargo.html Revithoussa welcomes the first US LNG cargo at the newly built 3rd tank]
 
# [https://abarrelfull.blogspot.com/2021/11/revithoussa-welcomes-first-us-lng-cargo.html Revithoussa welcomes the first US LNG cargo at the newly built 3rd tank]
 
# [https://a-barrel-full.blogspot.com/2020/08/the-snam-enagas-fluxys-consortium.html The Snam, Enagás, Fluxys consortium awarded the tender for the acquisition of 66% of the Greek operator DESFA]
 
# [https://a-barrel-full.blogspot.com/2020/08/the-snam-enagas-fluxys-consortium.html The Snam, Enagás, Fluxys consortium awarded the tender for the acquisition of 66% of the Greek operator DESFA]
 +
 +
[[category:LNG]]
 +
[[category:Greece]]

Latest revision as of 14:02, 19 February 2023

Summary Information

  • Ownership: DESFA
  • Website: https://www.desfa.gr/
  • Location: Revithoussa Island, Megara Bay – Attica – GREECE
  • Capacity: 3.3 million tons/annum
  • Status: In Operation

Technical Details

  • Storage capacity:
    • 2 tanks of 65.000 m3
    • 1 tnks of 95.000-m3
  • Unloading capacity: 3.500 m3 LNG / hour.
  • Send out capacity:
    • 270 m3 LNG/hour or 1,4 bcma (S.M.S.R.).
    • 407 m3 LNG/hour or 2,1 bcma (Peak with 1 vaporizer as spare).
    • 533 m3 LNG/hour or 2,5 bcma (Full S.R. without spare).

History

  • 2000 - The terminal recieves its first cargo
  • 2007 - Terminal Expanded
  • 2012 - Tender launched for third tank
  • 2018 - Third tank enters operation
  • 2020 - A consortium of Snam, Enagás and Fluxys won the privatization tender for DESFA, becoming terminal operator

Ongoing Projects/Project Status

  • The facility has been expanded twice in 2000 and 2018.
  • The second expansion comprised one additional third LNG tank, one additional truck loading facilities and an increase of the send-out capacity

Suppliers / Customers

  • Suppliers:
    • Algeria, Sonatrach
    • Spot cargos are purchased from the USA
  • Customers: The terminal is connected to the Greek gas network

Other Information

  • The terminal was built by Sofregaz & Preliminary engineering studies were performed by Tractebel

Links

  1. Terminal Webpage
  2. Revithoussa LNG Terminal Presentation
  3. REVITHOUSSA - GREECE - LNG IMPORT TERMINAL - SECOND EXTENSION
  4. Saipem LNG References
  5. Tractebel Engineering LNG References
  6. Whessoe Engineering LNG References
  7. EGL Delivers First LNG Cargo To Greece
  8. Notice For an international tender for design and construction of a new LNG Tank in Revithoussa
  9. Revithoussa welcomes the first US LNG cargo at the newly built 3rd tank
  10. The Snam, Enagás, Fluxys consortium awarded the tender for the acquisition of 66% of the Greek operator DESFA