Regency Intrastate Gas Pipeline Company

From A Barrel Full
Revision as of 12:23, 13 September 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Source: * Destination: * Ownership: * Website: * Length: kilometres ( miles) * Capacity: per day * Status: Operating +++ Details * Regency Intr...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

  • Source:
  • Destination:
  • Ownership:
  • Website:
  • Length: kilometres ( miles)
  • Capacity: per day
  • Status: Operating

+++ Details

+++ Contractors

  • **Gulf Interstate Engineering:** Engineering, design and procurement services for the three compressor stations and four interstate delivery interconnects for the Haynesville Expansion Project

+++ History

  • 2005 - Northern Louisiana Expansion (Winnsboro Ext) completed
  • 2006 - Bossier Loop Phase 1
  • 2007 - Bossier Loop Phase 2 & North LA Growth Project
  • 2008 - South Texas Flashing/Tilden Expansion
  • 2010 - Haynesville Expansion Project & Red River Lateral commissioned

+++ Other Information

  • -

+++ Links

  1. EIA Natural Gas Pipeline Projects 2000-2009
  2. EIA Natural Gas Pipeline Projects 2010-2014
  3. Regency's Haynesville Project