Ravenspurn North Gas Field

From A Barrel Full
Revision as of 16:13, 3 September 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Perenco * Country: UK * Location: Southern North Sea * Production start: 1990 * Partners: * Type: Gas * Estimated Reserves: * Production Volu...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

  • Operator: Perenco
  • Country: UK
  • Location: Southern North Sea
  • Production start: 1990
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

+++ Contractors

  • **Heerema Marine Contractors:** Installation of Ravenspurn North ST-3 & Ravenspurn North ST-2
  • **Saipem:** Installation of Cleeton - Ravenspurn pipeline
  • **Technip:** Umbilicals

+++ History

  • 1986 - Field development approval granted
  • 1990 - Production started
  • 1998 - Centrica acquires a stake from Powergen
  • 2012 - Perenco acquires BP's stake and becomes operator

+++ Geology

+++ Links

  1. UK Oil and Gas Fields by Approval Date
  2. List Of Oil and Gas Production Platforms In The UK
  3. FoundOcean Europe Subsea References
  4. Saipem Pipeline References
  5. Centrica strikes offshore deal
  6. BP Agrees Sale of Southern Gas Assets to Perenco