Difference between revisions of "Ras Laffan Petrochemicals complex Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 8: | Line 8: | ||
* Description: integrated olefins and polyethylene facility. Completion is scheduled for 2026. | * Description: integrated olefins and polyethylene facility. Completion is scheduled for 2026. | ||
* Constructor: | * Constructor: | ||
+ | ** Samsung Engineering: Construction of production facilities for 2.08 million tons of ethylene, as well as its utilities and offsite facilities | ||
** Tecnimont: Implementation of a polyethylene plant which includes two polyethylene units, with a capacity of 1,000,000 and 680,000 tons per year respectively, together with the associated utilities and offsites facilities. | ** Tecnimont: Implementation of a polyethylene plant which includes two polyethylene units, with a capacity of 1,000,000 and 680,000 tons per year respectively, together with the associated utilities and offsites facilities. | ||
* Licensors: | * Licensors: | ||
Line 32: | Line 33: | ||
# [https://abarrelfull-of-petrochemicals.blogspot.com/2023/01/qatarenergy-makes-largest-investment-in.html QatarEnergy Makes The Largest Investment In Its History In The Petrochemical Sector In Qatar] | # [https://abarrelfull-of-petrochemicals.blogspot.com/2023/01/qatarenergy-makes-largest-investment-in.html QatarEnergy Makes The Largest Investment In Its History In The Petrochemical Sector In Qatar] | ||
# [https://abarrelfull-of-petrochemicals.blogspot.com/2023/01/official-kick-off-of-already-announced.html Official kick-off of the already announced USD 1.3 billion EPC petrochemical contract] | # [https://abarrelfull-of-petrochemicals.blogspot.com/2023/01/official-kick-off-of-already-announced.html Official kick-off of the already announced USD 1.3 billion EPC petrochemical contract] | ||
+ | # [https://abarrelfull-of-petrochemicals.blogspot.com/2023/01/samsung-engineering-receives-ethylene.html Samsung Engineering receives an Ethylene Project contract from Ras Laffan Petrochemicals in Qatar] | ||
[[category:Petrochemical]] | [[category:Petrochemical]] |
Revision as of 17:01, 13 January 2023
Contents
Summary Information
- Ownership: QatarEnergy 70%, Chevron Phillips 30%
- Website: https://www.qatarenergy.qa/
- Location: Ras Laffan
The Project
- Description: integrated olefins and polyethylene facility. Completion is scheduled for 2026.
- Constructor:
- Samsung Engineering: Construction of production facilities for 2.08 million tons of ethylene, as well as its utilities and offsite facilities
- Tecnimont: Implementation of a polyethylene plant which includes two polyethylene units, with a capacity of 1,000,000 and 680,000 tons per year respectively, together with the associated utilities and offsites facilities.
- Licensors:
Production Units
- An ethane cracker with a capacity of 2.1 million tons of ethylene per annum
- Two polyethylene trains with a combined output of 1.7 million tons per annum of High-Density Polyethylene (HDPE)
Raw Materials Supply
- Ethane
Products Produced
- High-Density Polyethylene (HDPE)
Other Information
- -
History
- 2022 - Final investment decision reached
- 2023 - Contracts awarded