Qalhat LNG Terminal

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Ownership: Qalhat LNG,
* Government of Oman (46.84%)
* Oman LNG L.L.C (36.80%)
* Union Fenosa Gas S.A. (7.36%)
* Itochu (3%)
* Mitsubishi Corporation (3%)
* Osaka Gas (3%)

+++ Brief Description

  • A single train liquifaction plant

+++ Technical Details

  • Storage capacity:
  • Constructor:
* **Chiyoda:** FEED
* **Chiyoda-Foster Wheeler:** Detailed engineering, procurement and construction (EPC)
* **DYWIDAG:** Full containment tank, Design & Build, Capacity: 2 x 120,000 m³
  • Licensor:

+++ History

  • 2003 - Chiyoda-Foster Wheeler was awarded a contract by Ministry of Oil and Gas for the detailed engineering, procurement and construction (EPC)
  • 2005 - First cargo is shipped from the terminal to Spain
  • 2006 - Itochu Corporation, Mitsubishi Corporation, and Osaka Gas reached an agreement for a partial equity acquisition of Qalhat LNG

+++ Ongoing Projects/Project Status

  • -

+++ Suppliers / Customers

  • Suppliers:
* Among the fields supplying the terminal are  the [[[Saih Nihayda Gas And Condensate Field]]], the [[[Barik Gas Field]]] and the [[[Saih Rawl Gas Field]]]
  • Customers:
* Union Fenosa Gas 1.65 mtpa
* Mitsubishi Corporation 0.8 mtpa
* Osaka Gas 0.8 mtpa.

+++ Other Information

  • -

+++ Relevant Links

  1. Terminal Profile
  2. [[[DYWIDAG LNG Tank References]]]
  3. [[[Chiyoda LNG References]]]
  4. Chiyoda Secured LNG Train EPC Contract in Oman
  5. Chiyoda-Foster Wheeler Secures LNG Train EPC Contract in the Sultanate of Oman
  6. Acquisition of Equity Interest in Qalhat LNG