Punj Lloyd Pipeline References

From A Barrel Full
Jump to navigation Jump to search
  1. Shah Gas Field
    • Gas Gathering Package 1– Abu Dhabi Development Co Ltd
    • Engineering, procurement, installation, commissioning assistance of eight well pad systems, (16” dia) 18 km four inter-pad lines (24” dia) 31 km four transfer lines and flow lines from the individual wells to their associated well pad.
    • Facilities include leak detection, Cathodic Protection, wellhead control, flow gathering and measurement, pressure protection, flare and drain, fire and gas detection, telecommunication and security systems etc., near the Shah processing facility in western region of Abu Dhabi
    • Ongoing Aug 2014

2 Sabah Sarawak Petronas Carigali Engineering, procurement, construction and commissioning of (36" Ongoing Gas Pipeline, Sdn Bhd dia) 521 km gas pipeline from Kimanis, Sabah to Bintulu, Sarawak, Jul 2012 Malaysia with Cathodic Protection, compressor stations, metering stations, intermediate scraper stations and launcher station, receiver station, 22 block valve stations, six future tap off points along the pipeline, SCADA, telecommunication, leak detection, fire & gas system and a gas management system. 3 Strategic Gas Qatar Petroleum Engineering, procurement and construction of (36” dia) 124 km and Ongoing Transmission, 87 km twin pipeline, OFC laying, station work, construction of six Jun 2011 Qatar block valve stations, modification and expansion of existing stations and construction of new station, relocation of 11 KV overhead power line in the pipeline route.

4 El Khoms-Tripoli Sirte Oil Co Pipeline Gas Compressor Stations, Libya 5 Melita-Tripoli Sirte Oil Co Pipeline, Libya


SCOPE STATUS

Balance work of (34’’ dia) 157 km gas pipeline, civil and mechanical Ongoing

work on gas metering stations, compressor stations at Sidra and Jun 2011

Wachkah including SCADA and telecommunication.


Engineering, procurement and construction of (34” dia) 98 km Ongoing

pipeline from Melita to Tripoli with (24” dia) 21 km branchline Jun 2011

including gas reducing, metering, compression stations and

telecommunication work.


6 Dahej-Vijaipur Gas Authority of Construction of (48" dia) 145.43 km natural gas pipeline from Dahej Ongoing, Pipeline India Ltd to Jambudi, Spread-1, OFC laying, mechanical, electrical and Feb 2011 Upgradation instrumentation work at Dahej despatch station, six sectionalising valve stations, one intermediate pigging station, including civil, structural and architectural work. 7 Oil & Gas Export Agip KCO Detailed engineering, procurement and construction of (24” dia) Onging Pipelines, 49.5 km oil pipeline with two crossings by horizontal directional Dec 2010 Kashagan, drilling method and 90 km gas pipeline in Atyrau region of western Kazakhstan Kazakhstan. 8 Darod-Jafrabad Gujarat State Engineering, procurement and construction of (24" dia) 103 km Ongoing Pipeline Petronet Ltd crude oil pipeline, Section B from Tana to Jafrabad. Sep 2010 9 Multi Product Qatar Petroleum Engineering, procurement, construction and installation of (18" dia) Ongoing Pipeline, Qatar 46 km multiproduct pipeline, OFC laying from Messaieed refinery to Aug 2010 Doha depot and station work at Mesaieed refinery and Doha depot including demolition. 10 Doha Urban Qatar Petroleum Engineering, procurement, construction and commissioning of Ongoing Pipeline (36”, 12’’ and 8’’ dia) 97.2 km gas pipelines, three new stations, Aug 2010 Relocation, six modification stations, decommissioning of existing pipelines and Qatar demolition of nine existing stations. 11 Reliance Cairn Energy Engineering, procurement, construction, installation, testing and Completed Spurline India Pty Ltd commissioning of heated and insulated (24” dia) 7.2 km crude oil Jun 2010 insulated pipeline, corrosion coated, PUF insulation completed with Skin Effect Tubing and HDPE outer sleeve and cables of heat tracing. 12 Essar Spurline Cairn Energy Procurement, construction and Installation of (24" dia) 3.3 km Completed India Pty Ltd crude oil insulated spurline and receiving facility within Essar Oil May 2010 Refinery for Mangla Development Pipeline, OFC laying, 3.3 km Skin Effect Heat Management System, mechanical, electrical and instrumentation work at AGI Salaya & Essar Receiving Facility including civil, structural and architectural work. 13 Mangla Cairn Energy Engineering, procurement and construction of (24" dia) 57 km crude Completed Development India Pty Ltd oil insulated pipeline and (8" dia) 57 km gas pipeline upto Salaya Apr 2010 Pipeline I & II AGI Station, 56.52 km Skin Effect Heat Management System, mechanical, electrical, civil, structural and architectural work. 14 Radhanpur Cairn Energy Engineering, procurement and construction of (10" dia) 22 km Completed Spurline India Pty Ltd crude oil insulated pipeline upto IOCL Radhanpur Terminal, OFC Mar 2010 laying, skin Effect Heat Management System, mechanical, electrical, instrumentation, civil, structural and architectural work.

  1. Karachaganak Oil and Gas Field
    • Karachaganak Petroleum Operating B.V. (KPO)
    • Stabilisation and Sweetening Train, Aksai
    • Installation of 26,000 inch dia piping and equipment erection at Karachaganak Oil & Gas Condensate Field in Kazakhstan.
    • Completed: Dec 2009
  2. Ras Laffan Olefins Co
    • UAE
    • Ethylene and Butene Pipelines,
    • Construction of (14’’ dia) 129.6 km, (10’’ dia) 5.1 km dense phase ethylene pipelines and (3’’ dia) 5.1 km butane pipeline from Ras Laffan to Mesaieed including scraper launcher, receiver, four block valve stations, satellite and station S, Cathodic Protection, OFC, pre-commissioning and commissioning assistance.
    • Completed: Dec 2009
  3. Karachaganak Oil and Gas Field
    • Karachaganak Petroleum Operating B.V. (KPO)
    • Karachaganak-Uralsk Gas Pipeline
    • Laying of pipeline by HDD across five rivers Gnyloy Lake, Ural, Barabastau, Karoba and Utva with a total length 3320 m. Executed longest HDD crossing of Ural River, 1015 m in Kazakhstan.
    • Completed Oct 2009


18 OGC Pipelines, Oman Gas Co Engineering, procurement and construction of : Completed Oman • (24’’ dia) 40 km Murayrat-Barka, Russayl Looplines Sep 2009 • Barka PRT Expansion • (32” dia) 252 km Saih Rawl-Mukhaizna Loopline • Three compressor stations at Nimr including scraper launcher, receiver, seven block valve stations, Cathodic Protection, SCADA telecommunication, pre-commissioning and commissioning. 19 Asab Gas Eastern Bechtel Construction of (16” dia) 82 km pipeline from Habshan to Asab, Completed Development Co Ltd/Abu Dhabi UAE including block valve stations. Aug 2009 Phase II Gas Industries Ltd (GASCO) 20 Onshore Gas Eastern Bechtel Construction of (24”, 20” dia) 105 km pipeline from Habshan to Completed Development Co Ltd/Abu Dhabi Ruwais, UAE including block valve stations. Aug 2009 Phase III Gas Industries Ltd (GASCO) 21 Dabhol Panvel Gas Authority of Engineering, procurement and commissioning of (30" dia) 50.3 km Completed Pipeline Phase II India Ltd natural gas pipeline from Ambewadi despatch terminal to Usar Jun 2009 receiver terminal including spurlines to NITCO, and two sectionalising valve stations, one crossing by HDD across Amba river. 22 East-West Reliance Gas Construction of (48" dia) 2.3 km natural gas pipeline in the western Completed Gas Pipeline Transportation mountain range with steep slope upto 70O by cable crane system Feb 2009 (Bhivpuri Ghat) Infrastructure Ltd with specialised crew. 23 East-West Gas Reliance Gas Construction and laying of (48" dia) 117.5 km natural gas pipeline Completed Pipeline Transportation with automatic / semi-automatic welding technology, including three Jan 2009 Spread 6A & 6B Infrastructure Ltd sectionalising valve stations and two compressor stations. 24 Eastern Gas Dolphin Energy Engineering, procurement and construction of 260 km OFC with Completed Distribution Ltd (DEL) earthwork along the Jebel Ali – Taweela – Maqta - Al Ain pipeline, Nov 2008 System Upgrade, mechanical and coating repairs on pipelines and restoration of UAE damaged berms.

  1. Bu Hasa Oil Field
    • Adco
    • Flowlines & WellHeads
    • Wellhead, flow line, water injection line installations, tie-in to existing injection header, tie-ins at header/manifold, physical tagging. including pre-commissioning and commissioning support.
    • Oct 2008


26 South Sumatra PT Perusahaan to West Java Gas Gas Negara/JFE Pipeline Phase I, Engineering Sumatra 27 Dabhol Panvel Gas Authority of Pipeline Phase I India Ltd


SCOPE STATUS

Engineering, procurement and construction of (32” dia) 270 km Completed

onshore pipeline installation from Pagardewa to Labuhan Maringgai, Sept 2008

including sectionalising valve stations, civil, mechanical, piping,

instrumentation, insulation work at Pagardewa, Terbanggi Besar and

Labuhan Maringgai, Indonesia.

Residual engineering, procurement (excluding supply of line pipe) Completed

installation, testing, commissioning of pipeline and associated Feb 2008

facilities for (30” dia) 113 km pipeline including EGP, permanent pig

launcher, receiver, signalers, actuators for actuated valves, CCVT/

TEG, permanent Cathodic Protection System, interference surveys

and implementation of mitigation measures for CP System.


28 Dahej-Uran Gas Authority Pipeline of India 29 Mundra Delhi Hindustan Pipeline Petroleum Corp Ltd 30 South Sumatra PT Perusahaan to West Java Gas Gas Negara Pipeline, Phase II


Laying of (30” dia) 144 km pipeline and associated facilities Completed including eight crossings by horizontal directional drilling method. May 2007 Laying of (18” dia) 434 km, (16” dia) 73 km and (8” dia) 35.7 km Completed pipeline and associated facilities including construction, testing, May 2007 pre-commissioning and commissioning assistance.

Design, construction, testing and mechanical completion of (32” dia) Completed 270 km pipeline from Pagardewa to Labuhan Maringgai and (28” dia) Mar 2007 4 km pipeline from Pagardewa receiving point to Pagardewa Station

including 9 crossings by HDD, 24 core OFC laying, 4 sectional valve stations and Cathodic Protection at Sumatra, Indonesia.


31 Mumbai- Bharat Petroleum Supply, construction of (16” dia) 332 km pipeline and piping systems, Completed Manmad- Corp Ltd Cathodic Protection, road/rail/water crossings, pre – commissioning Mar 2007 Manglya Pipeline including terminal piping work, commissioning assistance and hook-up work at terminals, associated mechanical, civil, structural, architectural, electrical, telecom and instrumentation work from Manglya Despatch Terminal to sectionalising valve station at Manglya to Piyala/Bijwasan. 32 Pune-Solapur Hindustan Procurement, construction, pre-commissioning and commissioning Completed Pipeline Petroleum assistance for (14” dia) 182 km and (12” dia) 161 km pipeline, Mar 2007 Corp Ltd including 9 sectionalising valve stations, associated mechanical, civil, structural, architectural, electrical, rotating equipment, Cathodic Protection, instrumentation and OFC laying work. 33 Huwailah Field Abu Dhabi Co Construction of flowlines & transfer line (10’’ dia) 30 km in Huwaila, Completed Development for Onshore UAE. Dec 2006 Oil Operations (ADCO)/Matrix Construction

  1. Tengiz Oil Field
    • Kazakhstan
    • Large and Small-Bore Pipelines for TCO Asset Development
    • Tengizchevroil (TCO)/PFD International LLC (Parsons/Fluor Daniel JV)
    • Construction of pipelines and flow lines 408 km LTCS piping fabrication (181,000 inch dia), erection (115,000 inch metre) and high pressure thick walled injection piping work upto 63 mm, HPPE pipe fusion welding and laying, equipment installation, civil, structural, painting, insulation work at Tengiz, Kazakhstan.
    • Completed: Dec 2006
  2. Tambora Gas Field
    • Indonesia
    • Tambora Phase II,
    • Total E&P
    • Engineering, procurement, supply and construction of gas pipeline
    • Completed
    • EPSC 2 for Indonesie network in swamp risers and dogleg installation to Gathering Testing
    • Jun 2006

Pipeline Network, Satellite Stations (GTS) and wellhead platforms: Indonesia • 24” dia line • 8” dia flow lines and 2” piggy back as gas instrument line • 5 km crossing of existing facilities and river by Horizontal Directional Drilling method • 2 river crossings by open cut method

36 Direct Gas BG Exploration Marketing and Production India Ltd/ Kvaerner Power Gas


SCOPE STATUS

Civil, mechanical and structural work for construction at ONGC Completed

Plant, Hazira. Jan 2006


37 Oman Gas Petroleum Engineering, procurement and construction of (48” dia) 265 km Completed Export Line, Development gas pipeline from KP 24.5 to BVS 09A including Cathodic Nov 2005 Oman Oman LLC Protection, 10 block valve stations, telecommunication, pre- commissioning and commissioning assistance. 38 Mora Sachin Gujarat Gas Construction of natural gas pipeline of (16” dia) 25 km and (12” dia) Completed Palsana Pipeline Co Ltd 11 km including installation of valve stations, pig launchers, pig Oct 2005 receivers, header fabrication, uploading, installation and hook-up of metering skid, pre-commissioning and commissioning assistance and Tapi river crossing by Horizontal Directional Drilling method.

  1. Baku Tbilisi Ceyhan Pipeline
    • Turkey
    • Botas/BTC Co/British Petroleum/ILF Consulting Engineers
    • Engineering, procurement and construction of crude oil pipeline (42” dia) 207 km and (34” dia) 124 km from pumping station No. 4 near Sivas to tank terminal at Ceyhan on the Mediterranean Sea, including Cathodic Protection, 13 block valve station and commissioning assistance.
    • Jul 2005


40 Baku-Tbilisi- Spie Capag Construction of (46” dia) 53.4 km of crude oil pipeline and Completed Ceyhan and – Petrofac (42” dia) 53.4 km of gas pipeline from KP 178 to KP 250 including Feb 2005 South Caucasus International Ltd Cathodic Protection, laying of HDP duct for optic fibre cable & block Pipeline valve stations at Georgia. 41 Shore Approach Gujarat Adani Construction of shore approach pipeline (48” dia) 1 km at Mundra Completed Pipeline Port Ltd/Valentine Port, Gujarat. Feb 2005 Maritime Ltd 42 Dahej-Vijaipur Gas Authority Engineering, procurement, fabrication, transportation, construction, Completed Gas Pipeline of India Ltd/ testing, drying, pre-commissioning and commissioning of (42” dia) Feb 2004 Engineers 506 km and (36” dia) 6.6 km Dahej Vijaipur pipeline project including India Ltd associated facilities like sectionalising stations, intermediate scraper stations, scraper launcher / receiver station, CP-cum-repeater stations, laying of optical fibre work of spread I, II, III & IVB of the pipeline system. 43 Mumbai- Bharat Petroleum Construction of (14” dia) 189.15 km multi-product pipeline from Completed Manmad Pipeline Corp Ltd/ Shirpur to Manglya, including sectionalising valve stations, scraper May 2003 Extension Engineers receiver, intermediate pigging stations, Cathodic Protection, OFC India Ltd laying and Narmada river crossing 950 m by Horizontal Directional Drilling method. 44 KAM Pipeline, PetroKazakhstan Construction of (16” dia) 177 km crude oil pipeline from Kumkol Completed Kazakhstan JSC to Dhuzaly via Aryskum, including block valves, pig launchers Apr 2003 and receivers, Cathodic Protection System and OFC. 45 Vizag- Gas Authority Installation of (10” dia) 176.23 km of LPG pipeline from SV-25 to Completed Secunderabad of India Ltd/ Secunderabad, including installation of Cathodic Protection System, Mar 2003 Pipeline Engineers OFC laying in HDPE duct and 12 Nos. sectionalising valve stations, India Ltd intermediate pigging station at Suryapet and receipt terminal at Secunderabad. 46 KG Basin Gas Authority Design, engineering and laying of combination of (18” dia) pipe Completed Phase-II Pipeline of India Ltd/ and 6.625” CS conduit with 2 x 50 mm HDPE interducts across Oct 2002 Engineers two rivers, Vainetyam Godavari (1,704 m) and Gowthami Godavari India Ltd (1,769 m), at Andhra Pradesh.

47 Mangalore- Petronet MHB Bangalore Ltd/Engineers Pipeline India Ltd


SCOPE STATUS

Installation of (24”/20” dia) 363.5 km pipeline, including installation Completed

of Cathodic Protection System, OFC laying and 15 Nos. stations Jul 2002

comprising sectionalising valve stations, intermediate pigging station,

despatch/receiving terminals and intermediate pumping stations for

multi-product pipeline.


48 Amboli-Jhagadia Gujarat Gas Design engineering and laying of bundle of pipes (24” dia) 1,248 m Completed Gas Pipeline Co Ltd pipe with 2 Nos. 3” CS with 2” HDPE interduct conduit with OFC Apr 2002 across Narmada river by Horizontal Directional Drilling method. 49 Barauni-Patna Indian Oil Laying of (20” dia) 1,900 m pipeline with 3” CS conduit interducted Completed Replacement Corp Ltd with 2” HDPE conduit across the Ganges river by Horizontal Mar 2002 Pipeline Directional Drilling method. 50 Mathura-Tundla Indian Oil Installation of (16” dia) API 5L Grade X 65 1,008 m pipeline across Completed Pipeline Corp Ltd Yamuna river by Horizontal Directional Drilling method. Jun 2000 51 Jamnagar-Loni Gas Authority Laying and installation of (16”/12” dia) 435 km LPG pipelines and Completed Pipeline of India Ltd/ associated systems/facilities for Sections III and IV. May 2000 Engineers India Ltd 52 Jamnagar-Loni Gas Authority Installation of (12” dia) API 5L Grade X 65 650 m pipeline and OFC Completed Pipeline of India Ltd/ across Yamuna river by Horizontal Directional Drilling method. Apr 2000 Engineers India Ltd 53 Outfall-Jetty-MTF Reliance Ports Construction of civil foundation, supply fabrication and erection Completed Area Pipeline and Terminals of pipe racks and pipe supports, fabrication and installation of Jul 1999 Ltd aboveground and underground pipelines (2 x 48” dia, 6 x 24” dia, 1 x 16” dia, 1 x 12” dia, 2 x 10” dia and 1 x 8” dia CS pipes with 2 x 24” dia and 1 x 4” dia GRE pipes) at Jamnagar Refinery. 54 Mumbai-Manmad Bharat Petroleum Construction of (18” dia) 253 km multi-product pipeline from Mahul Completed Pipeline Corp Ltd/ Refinery to Marketing Terminal at Manmad, including 47 km of city May 1999 Engineers area, Horizontal Directional Drilling of Ulhas river, 125 km through India Ltd rocky terrain. Laying, splicing, jointing of OFC. 55 Hazira- Gujarat Gas Laying of (18” dia) 75 km gas pipeline. Completed Ankleshwar Co Ltd May 1999 Pipeline 56 Effluent Outfall Indian Engineering, procurement and construction of 20” dia effluent Completed System Petrochemicals discharge systems into Gulf of Khambhat for IPCL Gandhar gas May 1999 Corp Ltd/ processing complex at Dahej, comprising 4.5 km long onshore Engineers section and 3.1 km long offshore section, complete with diffuser. India Ltd 57 Beanibazar- Gas Transmission Construction of twin-line (20” dia) 18 km natural gas pipeline, Completed Kailashtilla Co Ltd including interconnecting pipelines at gas fields in Bangladesh. Apr 1999 Pipeline 58 Propylene Reliance Fabrication and erection of 12” dia aboveground and underground Completed Pipeline in MTF Industries Ltd piping and allied underground work such as Cathodic Protection of Mar 1999 Area piping at Jamnagar Refinery. 59 Thal-Usar-Thal Gas Authority Laying of twin-gas pipeline of (26”/20” dia) 20 km from RCF complex Completed Pipeline of India Ltd/ at Thal to LPG recovery terminal at Usar. May 1998 Engineers India Ltd

  1. Haldia-Barauni Crude Oil Pipeline
    • Indian Oil Corp Ltd
    • Installation of (18” dia) API 5L Grade X 65 724 m pipeline and OFC across Rupnarayan river and Harohar river by Horizontal Directional Drilling method.
    • Completed Apr 1998


61 Multi-product Kumpunan Juri Construction of (16” dia) 128 km multi-product pipeline from Melaka Completed Pipeline Teknik Sdn. Bhd., Refinery along the west coast of Malaysian Peninsula to Kuala Jul 1997 NKK Corp and Lumpur International Airport and a new distribution terminal at Klang Nichimen Corp Valley for Petronas and Shell Malaysia. (Joint Venture) 62 Gas Gas Authority Detailed engineering, procurement, construction and pre- Completed Rehabilitation of India Ltd/ commissioning of pipeline system of 349 km section of Bijaipur- Mar 1997 and Expansion Engineers Dadri gas pipeline; Bijaipur-Burda (36” dia) 170 km; Bhojera-Dadri India Ltd (36” dia) 165 km and (14” dia) 14 km spurline to Faridabad, including sectionalising stations, scraper stations, associated mechanical, civil, structural, architectural, electrical, Cathodic Protection, instrumentation and laying of OFC work. 63 Raw Water Reliance Construction and laying of (48” dia) 20 km raw water pipeline, Completed System Industries and approach bridge and intake well on Tapi river at Hazira. Feb 1996 Infrastructure Ltd 64 Kandla-Bhatinda Skoda Export/ Laying of 557 km product pipeline: Sanganer-Karnal (22” dia) Completed Pipeline Indian Oil Corp 339 km and Karnal-Bhatinda (14” dia) 218 km, 10 Horizontal Feb 1996 Directional Drilling crossing of canals. Laying, splicing, jointing of OFC. 65 Perennial River Gas Authority Installation of (12” dia) API 5L Grade X 42 874 m pipeline across Completed Crossing of India Ltd/ Sabarmati river by Horizontal Directional Drilling method. Feb 1996 Engineers India Ltd 66 NGL Pipeline Reliance Fabrication, laying and testing of (18” dia) 7 km NGL/HSD pipelines Completed Industries Ltd from RIL to ONGC and interconnection with Essar lines for SBM Dec 1995 Project at RIL Hazira.

  1. Bassein Oil And Gas Field
    • Oil and Natural Gas Corp Ltd
    • Hyundai Heavy Industries Ltd
    • South Bassein - Hazira Trunkline
#* Laying of (42” dia) 21 km onshore portion of pipeline, including shore approach and tidal flats
    • May 1995


68 Gandhar-Zanor Gas Authority of Laying of (18” dia) 40 km gas pipeline to NTPC plant in Gujarat. Completed Pipeline India Ltd Mar 1995 69 JNPT Pipeline Reliance Laying of twin (8” dia) 23 km and (16” dia) 6 km product pipeline Completed Industries and from Kalamboli to Nhava Sheva. Dec 1994 Infrastructure Ltd 70 RSEB Gas Gas Authority of Laying of (12” dia) 32 km gas pipeline from Gamnewalan to Completed Pipeline India Ltd Ramgarh in Rajasthan. Apr 1994 71 Balongan-Jakarta PT Trihasra Laying of (16” dia) 210 km multi-product pipeline through marshes, Completed Product Pipeline Bimanusa city area and multiple crossings in Indonesia. Dec 1993 Tunggal/ Pertamina 72 Jarn Yaphour Abu Dhabi Construction of wellheads, flow lines, manifold, transfer line and Completed Field National Oil related work in association with Sigma Specialised Engineering Oct 1993 Development Co Ltd/ and Construction Ltd, Abu Dhabi, UAE. (Upstream) Snamprogetti

73 Raw Water Intake Chambal

System Fertilisers and

Chemicals Ltd


SCOPE STATUS

Design, procurement, erection and commissioning of raw water Completed

system comprising approach bridge, intake well, tunnel, pumping Jun 1993

station and (24” dia) 7 km pipeline for Gadepan plant.


74 Grasim Gas Gas Authority of Laying of (12” dia) 32 km gas pipeline from Thal to Grasim plant Completed Pipeline India Ltd/PDIL in Raigad District, Maharashtra, including laying of pipeline across Nov 1992 Kundalika river (span 1,200 m). 75 City Gas Gujarat Gas Laying of 11 km of pipeline for Surat Gas Distribution Grid, including Completed Distribution Co Ltd associated facilities. May 1991 System 76 Gandhar-Bharuch Oil and Natural Laying of (18” dia) 42 km gas pipeline to GNFC fertiliser plant Completed Pipeline Gas Corp Ltd at Bharuch. Mar 1991 77 Dahej-Gandhar Oil and Natural Laying of (8” dia) 40 km gas pipeline in Gujarat. Completed Pipeline Gas Corp Ltd May 1989 78 Kalol-Navagam Oil and Natural Laying of (14” dia) 80 km oil pipeline from North Kadi CTF to Completed Pipeline Gas Corp Ltd Navagam in Gujarat. Mar 1989 79 Haldia- Indian Oil Laying section of (12” dia) 18.5 km product pipeline and retrieval of Completed Mourigram Corp Ltd 18.5 km existing corroded pipeline in West Bengal. May 1987 Pipeline Phase II 80 Haldia-Barauni Indian Oil Laying section of (12” dia) 25 km product pipeline and retrieval of Completed Pipeline Corp Ltd 25 km existing corroded pipeline in West Bengal. Jun 1986 81 Haldia- Indian Oil Laying section of (12” dia) 30 km product pipeline and retrieval of Completed Mourigram Corp Ltd 30 km existing corroded pipeline in West Bengal. Jun 1986 Pipeline, Phase I 82 Mumbai-Pune Hindustan Laying of (14” dia) 160 km pipeline for transportation of petroleum Completed Product Pipeline Petroleum Corp products through the western mountain range, highly congested Dec 1985 Ltd/Indian Oil city areas and the crossing of marshy areas, rivers and highways. Corp Ltd 83 Ankleshwar- Oil and Reconditioning of (16” dia) and (14” dia) 30 km crude oil pipeline Completed Baroda Pipeline Natural Gas in Gujarat. Feb 1985 Commission Ltd