Difference between revisions of "Preemraff Lysekil Refinery"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information Ownership: Preem Website: http://www.preem.se/ Location: Brofjorden, Lysekil about 120 km north of the town of Gothenburg on the west coast of Sweden Capac...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
− | Ownership: Preem | + | * Ownership: Preem |
− | Website: http://www.preem.se/ | + | * Website: http://www.preem.se/ |
− | Location: Brofjorden, Lysekil about 120 km north of the town of Gothenburg on the west coast of Sweden | + | * Location: Brofjorden, Lysekil about 120 km north of the town of Gothenburg on the west coast of Sweden |
− | Capacity: 11.4 million tonnes/annum, 220,000 bbl/day | + | * Capacity: 11.4 million tonnes/annum, 220,000 bbl/day |
− | Nelson Complexity: | + | * Nelson Complexity: |
− | Refining Depth: | + | * Refining Depth: |
− | Brief Description | + | === Brief Description === |
− | A large medium complexity refinery | + | * A large medium complexity refinery |
− | Refining Units | + | === Refining Units === |
− | Atmospheric Distillation | + | * Atmospheric Distillation |
− | Hydrocracker | + | * Hydrocracker |
− | Isomerization unit | + | * Isomerization unit |
− | Visbreaker | + | * Visbreaker |
− | Desulphurisation | + | * Desulphurisation |
− | Terminal Capacity | + | === Terminal Capacity === |
− | Crude Oil: | + | * Crude Oil: |
− | The storage include four crude oil caverns each having a capacity of 200.000 m3 | + | ** The storage include four crude oil caverns each having a capacity of 200.000 m3 - 140.000 m3 (1 million barrels) |
− | 140.000 m3 (1 million barrels) | + | * Refined Products: |
− | Refined Products: | + | ** Four product caverns for storage of diesel- and fuel oils and having a respective capacity of 44.000, 85.000, 73.000 and 85.000 m3 & 750.000 m3 (4.6 million barrels) |
− | Four product caverns for storage of diesel- and fuel oils and having a respective capacity of 44.000, 85.000, 73.000 and 85.000 m3 | + | === Crude Supply === |
− | 750.000 m3 (4.6 million barrels) | + | * Mostly crude form the North Sea |
− | Crude Supply | + | === Products Produced === |
− | Mostly crude form the North Sea | ||
− | Products Produced | ||
- | - | ||
− | Ongoing Projects | + | === Ongoing Projects === |
− | A new Vacuum distillation unit | + | * A new residue hydrocracker is to be constructed, for details see [[Preemraff Lysekil Refinery Residue Hydrocracker Project]] |
− | Foster Wheeler AG has been awarded a contract by Preem AB (Publ) Preemraff Lysekil (Preem) to perform the basic engineering design (BED) and front-end engineering design (FEED) for Preem's Energy Savings Program 2013 | + | * A new Vacuum distillation unit was commissioned in 2019 |
− | Honeywell is replacing the control systems | + | * Foster Wheeler AG has been awarded a contract by Preem AB (Publ) Preemraff Lysekil (Preem) to perform the basic engineering design (BED) and front-end engineering design (FEED) for Preem's Energy Savings Program 2013 |
− | Other Information | + | * Honeywell is replacing the control systems |
+ | === Other Information === | ||
- | - | ||
− | History | + | === History === |
− | 1975 - Refinery is commissioned | + | * 1975 - Refinery is commissioned |
− | 1982 - A Visbreaker was commissioned | + | * 1982 - A Visbreaker was commissioned |
− | A fluidized catalytic cracker was completed in autumn 1984. | + | * A fluidized catalytic cracker was completed in autumn 1984. |
− | 1988 - A mild hydrocracker was installed | + | * 1988 - A mild hydrocracker was installed |
− | 1990 - An isomerization unit was commissioned | + | * 1990 - An isomerization unit was commissioned |
− | In 1994 a sulphur tail gas treatment plant was commissioned and the diesel hydrotreating plant was rebuilt into a desulphurisation/dearomatization unit. | + | * In 1994 a sulphur tail gas treatment plant was commissioned and the diesel hydrotreating plant was rebuilt into a desulphurisation/dearomatization unit. |
− | 2002 - a new unit for production of polymer grade propylene was started. | + | * 2002 - a new unit for production of polymer grade propylene was started. |
− | 2005 - Foster Wheeler Awarded Study Contract For Fuel Oil Upgrading | + | * 2005 - Foster Wheeler Awarded Study Contract For Fuel Oil Upgrading |
− | 2006 - A new Hydrocracker and a hydrogen production unit were started. | + | * 2006 - A new Hydrocracker and a hydrogen production unit were started. |
− | 2007 - Preem announces a coker project for the refinery | + | * 2007 - Preem announces a coker project for the refinery |
− | 2009 - The Coker project is put on hold | + | * 2009 - The Coker project is put on hold |
− | 2009 - Visbreaker commissioned | + | * 2009 - Visbreaker commissioned |
− | 2016 - Contract signed for residue hydrocracker | + | * 2016 - Contract signed for residue hydrocracker |
− | + | === Links === | |
− | Technip Refining References | + | # [[Technip Refining References]] |
− | Persson inaugurated the new plant to produce sulfur-free diesel | + | # [http://killajoules.wikidot.com/archive:persson-inaugurated-the-new-plant-to-produce-sulfur Persson inaugurated the new plant to produce sulfur-free diesel] |
− | Preem to invest 6 billion in Lysekil | + | # [http://killajoules.wikidot.com/archive:preem-invests-6-billion-in-lysekil Preem to invest 6 billion in Lysekil] |
− | Foster Wheeler Awarded Study Contract For Fuel Oil Upgrading by Preem Petroleum AB, Sweden | + | # [http://killajoules.wikidot.com/archive:foster-wheeler-awarded-study-contract-for-fuel-oil-u Foster Wheeler Awarded Study Contract For Fuel Oil Upgrading by Preem Petroleum AB, Sweden] |
− | The Coker project at Preemraff Lysekil has been put on hold | + | # [http://killajoules.wikidot.com/archive:the-coker-project-at-preemraff-lysekil-has-been-put The Coker project at Preemraff Lysekil has been put on hold] |
− | Honeywell To Modernize Nordics’ Largest Refinery | + | # [http://killajoules.wikidot.com/blog:4693 Honeywell To Modernize Nordics’ Largest Refinery] |
− | CB&I Announces Technology and Development Contract for Residue Upgrading Complex in Sweden | + | # [http://killajoules.wikidot.com/archive:cb-i-announces-technology-and-development-contract-f CB&I Announces Technology and Development Contract for Residue Upgrading Complex in Sweden] |
− | Supplementary information concerning IMO 2020 regulations | + | # [http://killajoules.wikidot.com/archive:supplementary-information-concerning-imo-2020-regula Supplementary information concerning IMO 2020 regulations] |
+ | # [http://killajoules.wikidot.com/archive:mcdermott-to-proceed-with-feed-phase-of-residue-oil McDermott to proceed with FEED Phase of Residue Oil Conversion Project for Beowulf Energy at Preem refinery in Sweden] | ||
+ | |||
+ | [[category:Refinery]] |
Revision as of 18:04, 16 February 2020
Contents
Summary Information
- Ownership: Preem
- Website: http://www.preem.se/
- Location: Brofjorden, Lysekil about 120 km north of the town of Gothenburg on the west coast of Sweden
- Capacity: 11.4 million tonnes/annum, 220,000 bbl/day
- Nelson Complexity:
- Refining Depth:
Brief Description
- A large medium complexity refinery
Refining Units
- Atmospheric Distillation
- Hydrocracker
- Isomerization unit
- Visbreaker
- Desulphurisation
Terminal Capacity
- Crude Oil:
- The storage include four crude oil caverns each having a capacity of 200.000 m3 - 140.000 m3 (1 million barrels)
- Refined Products:
- Four product caverns for storage of diesel- and fuel oils and having a respective capacity of 44.000, 85.000, 73.000 and 85.000 m3 & 750.000 m3 (4.6 million barrels)
Crude Supply
- Mostly crude form the North Sea
Products Produced
-
Ongoing Projects
- A new residue hydrocracker is to be constructed, for details see Preemraff Lysekil Refinery Residue Hydrocracker Project
- A new Vacuum distillation unit was commissioned in 2019
- Foster Wheeler AG has been awarded a contract by Preem AB (Publ) Preemraff Lysekil (Preem) to perform the basic engineering design (BED) and front-end engineering design (FEED) for Preem's Energy Savings Program 2013
- Honeywell is replacing the control systems
Other Information
-
History
- 1975 - Refinery is commissioned
- 1982 - A Visbreaker was commissioned
- A fluidized catalytic cracker was completed in autumn 1984.
- 1988 - A mild hydrocracker was installed
- 1990 - An isomerization unit was commissioned
- In 1994 a sulphur tail gas treatment plant was commissioned and the diesel hydrotreating plant was rebuilt into a desulphurisation/dearomatization unit.
- 2002 - a new unit for production of polymer grade propylene was started.
- 2005 - Foster Wheeler Awarded Study Contract For Fuel Oil Upgrading
- 2006 - A new Hydrocracker and a hydrogen production unit were started.
- 2007 - Preem announces a coker project for the refinery
- 2009 - The Coker project is put on hold
- 2009 - Visbreaker commissioned
- 2016 - Contract signed for residue hydrocracker
Links
- Technip Refining References
- Persson inaugurated the new plant to produce sulfur-free diesel
- Preem to invest 6 billion in Lysekil
- Foster Wheeler Awarded Study Contract For Fuel Oil Upgrading by Preem Petroleum AB, Sweden
- The Coker project at Preemraff Lysekil has been put on hold
- Honeywell To Modernize Nordics’ Largest Refinery
- CB&I Announces Technology and Development Contract for Residue Upgrading Complex in Sweden
- Supplementary information concerning IMO 2020 regulations
- McDermott to proceed with FEED Phase of Residue Oil Conversion Project for Beowulf Energy at Preem refinery in Sweden