Difference between revisions of "Preemraff Lysekil Refinery"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information Ownership: Preem Website: http://www.preem.se/ Location: Brofjorden, Lysekil about 120 km north of the town of Gothenburg on the west coast of Sweden Capac...")
 
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
Ownership: Preem
+
* Ownership: Preem
Website: http://www.preem.se/
+
* Website: http://www.preem.se/
Location: Brofjorden, Lysekil about 120 km north of the town of Gothenburg on the west coast of Sweden
+
* Location: Brofjorden, Lysekil about 120 km north of the town of Gothenburg on the west coast of Sweden
Capacity: 11.4 million tonnes/annum, 220,000 bbl/day
+
* Capacity: 11.4 million tonnes/annum, 220,000 bbl/day
Nelson Complexity:
+
* Nelson Complexity:
Refining Depth:
+
* Refining Depth:
Brief Description
+
=== Brief Description ===
A large medium complexity refinery
+
* A large medium complexity refinery
Refining Units
+
=== Refining Units ===
Atmospheric Distillation
+
* Atmospheric Distillation
Hydrocracker
+
* Hydrocracker
Isomerization unit
+
* Isomerization unit
Visbreaker
+
* Visbreaker
Desulphurisation
+
* Desulphurisation
Terminal Capacity
+
=== Terminal Capacity ===
Crude Oil:
+
* Crude Oil:
The storage include four crude oil caverns each having a capacity of 200.000 m3
+
** The storage include four crude oil caverns each having a capacity of 200.000 m3 - 140.000 m3 (1 million barrels)
140.000 m3 (1 million barrels)
+
* Refined Products:
Refined Products:
+
** Four product caverns for storage of diesel- and fuel oils and having a respective capacity of 44.000, 85.000, 73.000 and 85.000 m3 & 750.000 m3 (4.6 million barrels)
Four product caverns for storage of diesel- and fuel oils and having a respective capacity of 44.000, 85.000, 73.000 and 85.000 m3
+
=== Crude Supply ===
750.000 m3 (4.6 million barrels)
+
* Mostly crude form the North Sea
Crude Supply
+
=== Products Produced ===
Mostly crude form the North Sea
 
Products Produced
 
 
-
 
-
Ongoing Projects
+
=== Ongoing Projects ===
A new Vacuum distillation unit is to be commisioned in 2019
+
* A new residue hydrocracker is to be constructed, for details see [[Preemraff Lysekil Refinery Residue Hydrocracker Project]]
Foster Wheeler AG has been awarded a contract by Preem AB (Publ) Preemraff Lysekil (Preem) to perform the basic engineering design (BED) and front-end engineering design (FEED) for Preem's Energy Savings Program 2013
+
* A new Vacuum distillation unit was commissioned in 2019
Honeywell is replacing the control systems
+
* Foster Wheeler AG has been awarded a contract by Preem AB (Publ) Preemraff Lysekil (Preem) to perform the basic engineering design (BED) and front-end engineering design (FEED) for Preem's Energy Savings Program 2013
Other Information
+
* Honeywell is replacing the control systems
 +
=== Other Information ===
 
-
 
-
History
+
=== History ===
1975 - Refinery is commissioned
+
* 1975 - Refinery is commissioned
1982 - A Visbreaker was commissioned
+
* 1982 - A Visbreaker was commissioned
A fluidized catalytic cracker was completed in autumn 1984.
+
* A fluidized catalytic cracker was completed in autumn 1984.
1988 - A mild hydrocracker was installed
+
* 1988 - A mild hydrocracker was installed
1990 - An isomerization unit was commissioned
+
* 1990 - An isomerization unit was commissioned
In 1994 a sulphur tail gas treatment plant was commissioned and the diesel hydrotreating plant was rebuilt into a desulphurisation/dearomatization unit.
+
* In 1994 a sulphur tail gas treatment plant was commissioned and the diesel hydrotreating plant was rebuilt into a desulphurisation/dearomatization unit.
2002 - a new unit for production of polymer grade propylene was started.
+
* 2002 - a new unit for production of polymer grade propylene was started.
2005 - Foster Wheeler Awarded Study Contract For Fuel Oil Upgrading
+
* 2005 - Foster Wheeler Awarded Study Contract For Fuel Oil Upgrading
2006 - A new Hydrocracker and a hydrogen production unit were started.
+
* 2006 - A new Hydrocracker and a hydrogen production unit were started.
2007 - Preem announces a coker project for the refinery
+
* 2007 - Preem announces a coker project for the refinery
2009 - The Coker project is put on hold
+
* 2009 - The Coker project is put on hold
2009 - Visbreaker commissioned
+
* 2009 - Visbreaker commissioned
2016 - Contract signed for residue hydrocracker
+
* 2016 - Contract signed for residue hydrocracker
Relevant Links
+
=== Links ===
Technip Refining References
+
# [[Technip Refining References]]
Persson inaugurated the new plant to produce sulfur-free diesel
+
# [http://killajoules.wikidot.com/archive:persson-inaugurated-the-new-plant-to-produce-sulfur Persson inaugurated the new plant to produce sulfur-free diesel]
Preem to invest 6 billion in Lysekil
+
# [http://killajoules.wikidot.com/archive:preem-invests-6-billion-in-lysekil Preem to invest 6 billion in Lysekil]
Foster Wheeler Awarded Study Contract For Fuel Oil Upgrading by Preem Petroleum AB, Sweden
+
# [http://killajoules.wikidot.com/archive:foster-wheeler-awarded-study-contract-for-fuel-oil-u Foster Wheeler Awarded Study Contract For Fuel Oil Upgrading by Preem Petroleum AB, Sweden]
The Coker project at Preemraff Lysekil has been put on hold
+
# [http://killajoules.wikidot.com/archive:the-coker-project-at-preemraff-lysekil-has-been-put The Coker project at Preemraff Lysekil has been put on hold]
Honeywell To Modernize Nordics’ Largest Refinery
+
# [http://killajoules.wikidot.com/blog:4693 Honeywell To Modernize Nordics’ Largest Refinery]
CB&I Announces Technology and Development Contract for Residue Upgrading Complex in Sweden
+
# [http://killajoules.wikidot.com/archive:cb-i-announces-technology-and-development-contract-f CB&I Announces Technology and Development Contract for Residue Upgrading Complex in Sweden]
Supplementary information concerning IMO 2020 regulations
+
# [http://killajoules.wikidot.com/archive:supplementary-information-concerning-imo-2020-regula Supplementary information concerning IMO 2020 regulations]
 +
# [http://killajoules.wikidot.com/archive:mcdermott-to-proceed-with-feed-phase-of-residue-oil McDermott to proceed with FEED Phase of Residue Oil Conversion Project for Beowulf Energy at Preem refinery in Sweden]
 +
 
 +
[[category:Refinery]]

Revision as of 18:04, 16 February 2020

Summary Information

  • Ownership: Preem
  • Website: http://www.preem.se/
  • Location: Brofjorden, Lysekil about 120 km north of the town of Gothenburg on the west coast of Sweden
  • Capacity: 11.4 million tonnes/annum, 220,000 bbl/day
  • Nelson Complexity:
  • Refining Depth:

Brief Description

  • A large medium complexity refinery

Refining Units

  • Atmospheric Distillation
  • Hydrocracker
  • Isomerization unit
  • Visbreaker
  • Desulphurisation

Terminal Capacity

  • Crude Oil:
    • The storage include four crude oil caverns each having a capacity of 200.000 m3 - 140.000 m3 (1 million barrels)
  • Refined Products:
    • Four product caverns for storage of diesel- and fuel oils and having a respective capacity of 44.000, 85.000, 73.000 and 85.000 m3 & 750.000 m3 (4.6 million barrels)

Crude Supply

  • Mostly crude form the North Sea

Products Produced

-

Ongoing Projects

  • A new residue hydrocracker is to be constructed, for details see Preemraff Lysekil Refinery Residue Hydrocracker Project
  • A new Vacuum distillation unit was commissioned in 2019
  • Foster Wheeler AG has been awarded a contract by Preem AB (Publ) Preemraff Lysekil (Preem) to perform the basic engineering design (BED) and front-end engineering design (FEED) for Preem's Energy Savings Program 2013
  • Honeywell is replacing the control systems

Other Information

-

History

  • 1975 - Refinery is commissioned
  • 1982 - A Visbreaker was commissioned
  • A fluidized catalytic cracker was completed in autumn 1984.
  • 1988 - A mild hydrocracker was installed
  • 1990 - An isomerization unit was commissioned
  • In 1994 a sulphur tail gas treatment plant was commissioned and the diesel hydrotreating plant was rebuilt into a desulphurisation/dearomatization unit.
  • 2002 - a new unit for production of polymer grade propylene was started.
  • 2005 - Foster Wheeler Awarded Study Contract For Fuel Oil Upgrading
  • 2006 - A new Hydrocracker and a hydrogen production unit were started.
  • 2007 - Preem announces a coker project for the refinery
  • 2009 - The Coker project is put on hold
  • 2009 - Visbreaker commissioned
  • 2016 - Contract signed for residue hydrocracker

Links

  1. Technip Refining References
  2. Persson inaugurated the new plant to produce sulfur-free diesel
  3. Preem to invest 6 billion in Lysekil
  4. Foster Wheeler Awarded Study Contract For Fuel Oil Upgrading by Preem Petroleum AB, Sweden
  5. The Coker project at Preemraff Lysekil has been put on hold
  6. Honeywell To Modernize Nordics’ Largest Refinery
  7. CB&I Announces Technology and Development Contract for Residue Upgrading Complex in Sweden
  8. Supplementary information concerning IMO 2020 regulations
  9. McDermott to proceed with FEED Phase of Residue Oil Conversion Project for Beowulf Energy at Preem refinery in Sweden