Difference between revisions of "Poseidon Oil Pipeline"

From A Barrel Full
Jump to navigation Jump to search
Line 4: Line 4:
 
* Destination: Houma, Louisiana
 
* Destination: Houma, Louisiana
 
* Ownership: Poseidon Oil Pipeline Company
 
* Ownership: Poseidon Oil Pipeline Company
* Enterprise, Shell, Genesis
+
** Enterprise, Shell, Genesis
 
* Website: http://www.poseidonoil.com/
 
* Website: http://www.poseidonoil.com/
 
* Length:  kilometres (367 miles)  
 
* Length:  kilometres (367 miles)  

Revision as of 07:02, 15 September 2023

Summary Information

  • Source: Gulf of Mexico
  • Destination: Houma, Louisiana
  • Ownership: Poseidon Oil Pipeline Company
    • Enterprise, Shell, Genesis
  • Website: http://www.poseidonoil.com/
  • Length: kilometres (367 miles)
  • Capacity: 400,000 barrels of oil per day
  • Crude Type:

+++ Brief Description

+++ Pipeline Status

  • In operation

+++ History

  • 1996 - Poseidon Oil Pipeline constructed
  • 2004 - The pipeline began receiving crude oil produced from the Marco Polo field
  • 2005 - The pipeline starts receiving oil from the [[[Front Runner Oil Field]]] and Tarantula field
  • 2012 - Genesis Energy acquired a 28% stake

+++ Other Information

  • -

+++ Links

  1. Enterprise Announces Receipt of New Production Into Poseidon Oil Pipeline System
  2. Genesis Energy, L.P. Completes Acquisition Of Interests In Gulf Of Mexico Oil Pipelines, Including Poseidon
  3. Shell Midstream Partners, L.P. Acquires Interest in Poseidon Oil Pipeline