Difference between revisions of "Port Qasim Floating LNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 11: Line 11:
 
* Connection to the grid consists of a 24 km high pressure piping network
 
* Connection to the grid consists of a 24 km high pressure piping network
 
* A new jetty was also constructed and commissioned
 
* A new jetty was also constructed and commissioned
* The vessel used was changed in 2020 to increase the capacity
+
* The vessel used was changed in 2020 to increase the capacity by 1 mn tons per annum
  
 
=== Technical Details ===
 
=== Technical Details ===
Line 28: Line 28:
  
  
=== History
+
=== History ===
 
* 2014 - Engro and SSGC sign LNG Service Agreement
 
* 2014 - Engro and SSGC sign LNG Service Agreement
 
* 2015 - Qatargas sells the first LNG cargo  
 
* 2015 - Qatargas sells the first LNG cargo  
 
* 2015 - First ship to ship transfer
 
* 2015 - First ship to ship transfer
 +
* 2020 - The capacity was increased by swapping the vessel for a larger ons
  
=== Other Information
+
=== Other Information ===
 
* -
 
* -
  

Latest revision as of 11:01, 17 January 2022

Summary Information

  • Ownership: Engro
  • Website: http://www.engro.com
  • Location: Port Qasim, Pakistan
  • Capacity: 3.0 million tons/annum
  • Status: In operation

Brief Description

  • A floating storage and regasification terminal
  • Connection to the grid consists of a 24 km high pressure piping network
  • A new jetty was also constructed and commissioned
  • The vessel used was changed in 2020 to increase the capacity by 1 mn tons per annum

Technical Details

  • Storage capacity:
  • Unloading capacity: 690 MMcf/d
  • Send out capacity:
  • Constructor:


Ongoing Projects/Project Status

  • The terminal was completed in 2015

Suppliers / Customers

  • Suppliers: Qatargas
  • Customers: SSGC


History

  • 2014 - Engro and SSGC sign LNG Service Agreement
  • 2015 - Qatargas sells the first LNG cargo
  • 2015 - First ship to ship transfer
  • 2020 - The capacity was increased by swapping the vessel for a larger ons

Other Information

  • -

Links

  1. Engro and SSGC sign LNG Service Agreement
  2. Qatargas sells the first LNG cargo to Pakistan to commission LNG terminal
  3. Engro Corporation and Excelerate Energy Commission Port Qasim LNG Terminal
  4. Excelerate’s FSRUs Perform the First STS Transfer of LNG at Engro Elengy LNG Terminal Pakistan
  5. Excelerate Energy and Engro Elengy Terminal Agree to Expand Pakistan LNG Import Terminal