Difference between revisions of "Port Qasim Floating LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: Engro * Website: http://www.engro.com * Location: Port Qasim, Pakistan * Capacity: 3.0 million tons/annum * Status: In operation +...") |
Abarrelfull (talk | contribs) |
||
Line 7: | Line 7: | ||
* Status: In operation | * Status: In operation | ||
− | + | === Brief Description === | |
* A floating storage and regasification terminal | * A floating storage and regasification terminal | ||
* Connection to the grid consists of a 24 km high pressure piping network | * Connection to the grid consists of a 24 km high pressure piping network | ||
− | * A new jetty | + | * A new jetty was also constructed and commissioned |
+ | * The vessel used was changed in 2020 to increase the capacity | ||
− | + | === Technical Details === | |
* Storage capacity: | * Storage capacity: | ||
* Unloading capacity: 690 MMcf/d | * Unloading capacity: 690 MMcf/d | ||
Line 19: | Line 20: | ||
− | + | === Ongoing Projects/Project Status === | |
* The terminal was completed in [[LNG Terminal Projects Completed in 2015 | 2015]] | * The terminal was completed in [[LNG Terminal Projects Completed in 2015 | 2015]] | ||
− | + | === Suppliers / Customers === | |
* Suppliers: Qatargas | * Suppliers: Qatargas | ||
* Customers: SSGC | * Customers: SSGC | ||
− | + | === History | |
* 2014 - Engro and SSGC sign LNG Service Agreement | * 2014 - Engro and SSGC sign LNG Service Agreement | ||
* 2015 - Qatargas sells the first LNG cargo | * 2015 - Qatargas sells the first LNG cargo | ||
* 2015 - First ship to ship transfer | * 2015 - First ship to ship transfer | ||
− | + | === Other Information | |
* - | * - | ||
Revision as of 10:59, 17 January 2022
Contents
Summary Information
- Ownership: Engro
- Website: http://www.engro.com
- Location: Port Qasim, Pakistan
- Capacity: 3.0 million tons/annum
- Status: In operation
Brief Description
- A floating storage and regasification terminal
- Connection to the grid consists of a 24 km high pressure piping network
- A new jetty was also constructed and commissioned
- The vessel used was changed in 2020 to increase the capacity
Technical Details
- Storage capacity:
- Unloading capacity: 690 MMcf/d
- Send out capacity:
- Constructor:
Ongoing Projects/Project Status
- The terminal was completed in 2015
Suppliers / Customers
- Suppliers: Qatargas
- Customers: SSGC
=== History
- 2014 - Engro and SSGC sign LNG Service Agreement
- 2015 - Qatargas sells the first LNG cargo
- 2015 - First ship to ship transfer
=== Other Information
- -