Port Meridian Floating LNG Terminal

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Ownership: Höegh LNG
  • Website: www.portmeridian.com (http://www.hoeghlng.com/)
  • Location: 35 kilometres offshore of the coastline of Fylde, North West England
  • Capacity: 6 million tons/annum
  • Status: Planned


+++ Brief Description

  • The facility will consist of one or more regasification vessels, two unloading buoys, a large diameter subsea pipeline and onshore facilities connecting the system to the UK National Transmissions system (NTS). The annual import capacity of the project is around 8 billion cubic metres

+++ Technical Details

  • Storage capacity: 170,000 m3 * 2
  • Unloading capacity:
  • Send out capacity:
  • Constructor: Hyundai Heavy Industries to build the two new LNG Floating Storage Regasification Units
  • Licensor:


+++ Ongoing Projects/Project Status

  • A Financial Investment Decision (FID) is expected by year end 2012
  • Completion expected in 2015

+++ Suppliers / Customers

  • Suppliers: [[[Magnolia LNG Export Terminal Project]]]
  • Customers: About 50 percent of the terminal's capacity will be sold on a medium-term basis, meaning between 3-5 years


+++ History

  • 2008 - Höegh LNG filed a planning application with Barrow Borough council for the onshore installations of the Port Meridian project
  • 2009 - Höegh LNG was granted final approvals to go ahead with the Port Meridian Deepwater Port project
  • 2011 - LNG vessels ordered from Hyundai Heavy Industries
  • 2015 - Meridian LNG signed supply agreement with Magnolia LNG

+++ Other Information

  • The terminal will be a merchant operation, renting capacity

+++ Relevant Links

  1. Höegh LNG has filed a planning application
  2. Höegh LNG granted final approvals to go ahead with the Port Meridian Deepwater Port project
  3. Hyundai Heavy Industries to build the world’s first two new LNG Floating Storage Regasification Units (FSRU)
  4. Magnolia LNG Signs Binding Agreement With Meridian LNG