Port Kembla LNG Terminal Project

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Ownership: Australian Industrial Energy (AIE)
  • Website: https://ausindenergy.com/
  • Location: Port Kembla
  • Capacity: million tons/annum
  • Status: Under construction

Brief Description

  • The terminal will consist of a FSRU, an offloading wharf and a 6km pipeline to connect the terminal to the grid

Technical Details

  • Storage capacity:
  • Unloading capacity:
  • Send out capacity:
  • Constructor:
    • Hoegh: supplied the vessel
    • Spiecapag and Soletanche Bachy: EPC for wharf and pipeline

Ongoing Projects/Project Status

  • Commissioning is scheduled for 2023

Suppliers / Customers

  • Suppliers:
  • Customers: The terminal will be connected to the Eastern Gas Pipeline, the major natural gas arterial between Victoria and NSW

History

  • 2019 - EPC contracts signed for the wharf and pipeline
  • 2021 - AIE signed a contract with Hoegh for the provison of the FSRU

Other Information

-

Links

  1. AIE awards construction contract for the Port Kembla Gas Terminal
  2. AIE and Höegh LNG Sign Deal To Secure NSW and Victoria’s Energy Future; Co-Develop New Generation Clean Energy Transport Potential