Difference between revisions of "Port Kembla LNG Terminal Project"

From A Barrel Full
Jump to navigation Jump to search
 
(5 intermediate revisions by the same user not shown)
Line 8: Line 8:
  
 
=== Brief Description ===
 
=== Brief Description ===
* The terminal will consist of a FSRU, an offloading wharf and a pipeline to connect the terminal to the grid  
+
* The terminal will consist of a FSRU, an offloading wharf and a 6km pipeline to connect the terminal to the grid
  
 
=== Technical Details ===
 
=== Technical Details ===
Line 16: Line 16:
 
* Send out capacity:
 
* Send out capacity:
 
* Constructor:
 
* Constructor:
 +
** Hoegh: supplied the vessel
 +
** Spiecapag and Soletanche Bachy: EPC for wharf and pipeline
  
 
=== Ongoing Projects/Project Status ===
 
=== Ongoing Projects/Project Status ===
Line 23: Line 25:
  
 
* Suppliers:
 
* Suppliers:
* Customers:
+
* Customers: The terminal will be connected to the Eastern Gas Pipeline, the major natural gas arterial between Victoria and NSW
 +
 
 
=== History ===
 
=== History ===
  
* 200X -  
+
* 2019 - EPC contracts signed for the wharf and pipeline
 +
* 2021 - AIE signed a contract with Hoegh for the provison of the FSRU
  
 
=== Other Information ===
 
=== Other Information ===
Line 32: Line 36:
 
-
 
-
 
=== Links ===
 
=== Links ===
 +
# [https://abarrelfull.blogspot.com/2022/01/aie-awards-construction-contract-for.html AIE awards construction contract for the Port Kembla Gas Terminal]
 
# [https://abarrelfull.blogspot.com/2022/01/aie-and-hoegh-lng-sign-deal-to-secure.html AIE and Höegh LNG Sign Deal To Secure NSW and Victoria’s Energy Future; Co-Develop New Generation Clean Energy Transport Potential ]
 
# [https://abarrelfull.blogspot.com/2022/01/aie-and-hoegh-lng-sign-deal-to-secure.html AIE and Höegh LNG Sign Deal To Secure NSW and Victoria’s Energy Future; Co-Develop New Generation Clean Energy Transport Potential ]
 +
 +
[[category:LNG]]
 +
[[category:Australia]]

Latest revision as of 16:03, 16 November 2022

Summary Information

  • Ownership: Australian Industrial Energy (AIE)
  • Website: https://ausindenergy.com/
  • Location: Port Kembla
  • Capacity: million tons/annum
  • Status: Under construction

Brief Description

  • The terminal will consist of a FSRU, an offloading wharf and a 6km pipeline to connect the terminal to the grid

Technical Details

  • Storage capacity:
  • Unloading capacity:
  • Send out capacity:
  • Constructor:
    • Hoegh: supplied the vessel
    • Spiecapag and Soletanche Bachy: EPC for wharf and pipeline

Ongoing Projects/Project Status

  • Commissioning is scheduled for 2023

Suppliers / Customers

  • Suppliers:
  • Customers: The terminal will be connected to the Eastern Gas Pipeline, the major natural gas arterial between Victoria and NSW

History

  • 2019 - EPC contracts signed for the wharf and pipeline
  • 2021 - AIE signed a contract with Hoegh for the provison of the FSRU

Other Information

-

Links

  1. AIE awards construction contract for the Port Kembla Gas Terminal
  2. AIE and Höegh LNG Sign Deal To Secure NSW and Victoria’s Energy Future; Co-Develop New Generation Clean Energy Transport Potential