Difference between revisions of "Port Kembla LNG Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (→Links) |
Abarrelfull (talk | contribs) |
||
Line 16: | Line 16: | ||
* Send out capacity: | * Send out capacity: | ||
* Constructor: | * Constructor: | ||
+ | ** Hoegh: supplied the vessel | ||
+ | ** Spiecapag and Soletanche Bachy: EPC for wharf and pipeline | ||
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === |
Revision as of 17:04, 5 January 2022
Contents
Summary Information
- Ownership: Australian Industrial Energy (AIE)
- Website: https://ausindenergy.com/
- Location: Port Kembla
- Capacity: million tons/annum
- Status: Under construction
Brief Description
- The terminal will consist of a FSRU, an offloading wharf and a pipeline to connect the terminal to the grid
Technical Details
- Storage capacity:
- Unloading capacity:
- Send out capacity:
- Constructor:
- Hoegh: supplied the vessel
- Spiecapag and Soletanche Bachy: EPC for wharf and pipeline
Ongoing Projects/Project Status
- Commissioning is scheduled for 2023
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2019 - EPC contracts signed for the wharf and pipeline
- 2021 - AIE signed a contract with Hoegh for the provison of the FSRU
Other Information
-