Difference between revisions of "Port Kembla LNG Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (→Links) |
Abarrelfull (talk | contribs) |
||
Line 26: | Line 26: | ||
=== History === | === History === | ||
− | * | + | * 2019 - EPC contracts signed for the wharf and pipeline |
+ | * 2021 - AIE signed a contract with Hoegh for the provison of the FSRU | ||
=== Other Information === | === Other Information === |
Revision as of 17:01, 5 January 2022
Contents
Summary Information
- Ownership: Australian Industrial Energy (AIE)
- Website: https://ausindenergy.com/
- Location: Port Kembla
- Capacity: million tons/annum
- Status: Under construction
Brief Description
- The terminal will consist of a FSRU, an offloading wharf and a pipeline to connect the terminal to the grid
Technical Details
- Storage capacity:
- Unloading capacity:
- Send out capacity:
- Constructor:
Ongoing Projects/Project Status
- Commissioning is scheduled for 2023
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2019 - EPC contracts signed for the wharf and pipeline
- 2021 - AIE signed a contract with Hoegh for the provison of the FSRU
Other Information
-