Difference between revisions of "Port Kembla LNG Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) (→Links) |
||
Line 32: | Line 32: | ||
- | - | ||
=== Links === | === Links === | ||
− | # | + | # [https://abarrelfull.blogspot.com/2022/01/aie-and-hoegh-lng-sign-deal-to-secure.html AIE and Höegh LNG Sign Deal To Secure NSW and Victoria’s Energy Future; Co-Develop New Generation Clean Energy Transport Potential ] |
Revision as of 16:59, 5 January 2022
Contents
Summary Information
- Ownership: Australian Industrial Energy (AIE)
- Website: https://ausindenergy.com/
- Location: Port Kembla
- Capacity: million tons/annum
- Status: Under construction
Brief Description
- The terminal will consist of a FSRU, an offloading wharf and a pipeline to connect the terminal to the grid
Technical Details
- Storage capacity:
- Unloading capacity:
- Send out capacity:
- Constructor:
Ongoing Projects/Project Status
- Commissioning is scheduled for 2023
Suppliers / Customers
- Suppliers:
- Customers:
History
- 200X -
Other Information
-