Difference between revisions of "Port Kembla LNG Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: * Website: * Location: * Capacity: million tons/annum * Status: === Brief Description === * The terminal will consist of a FSRU,...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Ownership: | + | * Ownership: Australian Industrial Energy (AIE) |
− | * Website: | + | * Website: https://ausindenergy.com/ |
− | * Location: | + | * Location: Port Kembla |
* Capacity: million tons/annum | * Capacity: million tons/annum | ||
− | * Status: | + | * Status: Under construction |
+ | |||
=== Brief Description === | === Brief Description === | ||
* The terminal will consist of a FSRU, an offloading wharf and a pipeline to connect the terminal to the grid | * The terminal will consist of a FSRU, an offloading wharf and a pipeline to connect the terminal to the grid |
Revision as of 16:04, 5 January 2022
Contents
Summary Information
- Ownership: Australian Industrial Energy (AIE)
- Website: https://ausindenergy.com/
- Location: Port Kembla
- Capacity: million tons/annum
- Status: Under construction
Brief Description
- The terminal will consist of a FSRU, an offloading wharf and a pipeline to connect the terminal to the grid
Technical Details
- Storage capacity:
- Unloading capacity:
- Send out capacity:
- Constructor:
Ongoing Projects/Project Status
- Commissioning is scheduled for completion in 2023
Suppliers / Customers
- Suppliers:
- Customers:
History
- 200X -
Other Information
-