Summary Information
- Ownership: Petrotrin
- Website: http://www.petrotrin.com/
- Wikipage: [[[Pointe A Pierre Refinery]]]
- Location: Pointe-a-Pierre, Trinidad
- Capacity: 8.75 million tons/annum & 175,000 bbl/day
- Nelson Complexity:
- Project Stage: Close to completion
- Expected Completion:
* GOP: 2010 * ULSD: 2012
- Budget:
* GOP: $180 Million * ULSD: $220 Million
+++ The Project
- Project Type: Upgrading to produce clean fuels
- Project Summary: GOP
* UOP will provide Petrotrin technology for a CCR Platforming™ unit with a Chlorsorb™ system for reforming naphtha to produce high-octane fuel; a Penex™ unit for producing clean-burning gasoline; and a Merox™ unit for cleaning liquefied petroleum gas (LPG). * UOP will also revamp a fluid catalytic cracking (FCC) unit used to convert vacuum gas oil to gasoline, and upgrade the FCC unit with a third stage separator (TSS)
- Project Summary: ULSD
* The ULSD Plant is designed to process 40,000 barrels per stream day (BPSD) of diesel boiling range feeding stocks to produce a diesel product with a total sulphur of 8 ppm max, a total aromatics content of less than 25% wt and a cetane number of 51 min consistent with the most stringent and forecasted future on road fuel specifications
- Main Contractors: Samsung Engineering
- Licences: UOP
+++ Refining Units
- CCR Platforming
- Merox unit
- Penex unit
- FCC unit - Revamp
- Diesel Desulphurisation
+++ Terminal Capacity
- Crude Oil:
- Refined Products:
+++ Crude Supply
- -
+++ Products Produced
- The GOP project will increase gasoline yield and improve the quality of the gasoline produced.
- The ULSD project will enable Petrotrin to produce a diesel product with a total sulphur of 8 ppm max, a total aromatics content of less than 25% wt and a cetane number of 51 min consistent with the most stringent and forecasted future on road fuel specifications
+++ Other Information
- -
+++ Relevant Links