Difference between revisions of "Poinsettia Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Operator: Shell * Country: Trinidad and Tobago * Location: North Coast Marine Area (NCMA) * Production start: 2009 * Partners: * Type: Oil / Gas...") |
Abarrelfull (talk | contribs) |
||
Line 14: | Line 14: | ||
* Gas is transported via a 20-inch diameter pipeline to the [[Hibiscus Gas Field | Hibiscus platform]] before final pipeline transmission to shore | * Gas is transported via a 20-inch diameter pipeline to the [[Hibiscus Gas Field | Hibiscus platform]] before final pipeline transmission to shore | ||
* The gas is supplied to the [[Atlantic LNG Terminal]] | * The gas is supplied to the [[Atlantic LNG Terminal]] | ||
+ | * The Colibri field consists of four subsea gas wells, tied back to the Poinsettia Platform | ||
=== Contractors === | === Contractors === | ||
Line 25: | Line 26: | ||
* 2007 - Fluor / McDermott awarded topsides contract | * 2007 - Fluor / McDermott awarded topsides contract | ||
* 2009 - First gas produced | * 2009 - First gas produced | ||
+ | * 2020 - FID for the Colibri field | ||
+ | * 2022 - Colibri field came onstream | ||
=== Geology === | === Geology === | ||
Line 37: | Line 40: | ||
# [http://killajoules.wikidot.com/archive:fluor-led-consortium-to-build-offshore-drilling-gas Fluor-Led Consortium to Build Offshore Drilling & Gas Production Platform off Coast of Trinidad] | # [http://killajoules.wikidot.com/archive:fluor-led-consortium-to-build-offshore-drilling-gas Fluor-Led Consortium to Build Offshore Drilling & Gas Production Platform off Coast of Trinidad] | ||
# [http://killajoules.wikidot.com/archive:fluor-led-offshore-project-reaches-first-gas Fluor-Led Offshore Project Reaches First Gas] | # [http://killajoules.wikidot.com/archive:fluor-led-offshore-project-reaches-first-gas Fluor-Led Offshore Project Reaches First Gas] | ||
+ | # [https://abarrelfull.blogspot.com/2023/04/shell-trinidad-and-tobago-delivers.html Shell Trinidad and Tobago delivers first gas from Colibri Project] | ||
[[category:Field]] | [[category:Field]] | ||
− | [[category: | + | [[category:Trinidad and Tobago]] |
− | [[category: | + | [[category:Shell]] |
Latest revision as of 07:43, 12 April 2023
Summary Information
- Operator: Shell
- Country: Trinidad and Tobago
- Location: North Coast Marine Area (NCMA)
- Production start: 2009
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- Located off the northwest shore of Trinidad in water 530 feet deep
- The Poinsettia platform can produce as much as 350 million standard-cubic-feet-per-day of gas
- Gas is transported via a 20-inch diameter pipeline to the Hibiscus platform before final pipeline transmission to shore
- The gas is supplied to the Atlantic LNG Terminal
- The Colibri field consists of four subsea gas wells, tied back to the Poinsettia Platform
Contractors
- **Fluor / McDermott:** program management, engineering, procurement, construction and installation (EPCI) of the 4,000-ton topsides for the offshore drilling and gas production platform
- **Tofco:** Deck Fabrication
- **Derescom:** Fuel Gas Treatment/Pressure Reduction Package
- **FoundOcean:** Grouting
History
- 2000 - The Government of Trinidad & Tobago approved the development
- 2007 - Fluor / McDermott awarded topsides contract
- 2009 - First gas produced
- 2020 - FID for the Colibri field
- 2022 - Colibri field came onstream
Geology
Links
- TOFCO Platform References
- FoundOcean Subsea References
- Mcdermott Platform References
- Derescom Oil And Gas Processing References
- Trinidad & Tobago Government gives go-ahead to new gas province
- Fluor-Led Consortium to Build Offshore Drilling & Gas Production Platform off Coast of Trinidad
- Fluor-Led Offshore Project Reaches First Gas
- Shell Trinidad and Tobago delivers first gas from Colibri Project